Chicago Electric 96035 operating instructions Slide Gearbox open so that Wire Board

Page 14

Figure 3

Left Handle

(92)

Nut (91)

Figure 6

3.Use a Wrench to loosen the Nut (91) holding the Left Handle (92) in place.

See Figure 6.

Figure 7

Spline Axle (27)

Left Handle

(92)

Screws (25)

Gearbox (23)

Figure 8

5.Remove the four Screws (25) from the side of the Gearbox 23. See Figure 8.

Wire Board

(50)

Screw (52)

Figure 9

4. CAUTION: When removing Left Handle, 6.

Slide Gearbox open so that Wire Board

do not pull too far from Spline Axle (27)

(50) is visible. Use screwdriver (not

Only wiggle loose until partially off. See

included) to loosen Screw (52) from Wire

Figure 7.

Fixing Board. See Figure 9.

Page 14

For technical questions, please call 1-800-444-3353.

SKU 96035

Image 14
Contents Horsepower industrial breaker hammer kit For technical questions or replacement parts, please callSave all warnings and instructions for future reference General Power Tool Safety WarningsSave This Manual Power tool will increase the risk of electric shock Breaker Hammer Safety Warnings Vibration Safety Extension Cords GroundingGrounded Tools Tools with Three Prong Plugs Symbology 25’ 50’ 75’Specifications UnpackingAssembly Instructions for putting Into useInstalling a Chisel Without a CollarWith a Collar SKU For technical questions, please callGeneral Operation Work Piece and Work Area Set UpOperating Instructions Use this tool only with a AMP Circuit BreakerSlide Cover off top of Breaker Hammer. See Figure Slide Gearbox open so that Wire Board Wire Fixing Board Maintenance Servicing Cleaning, Maintenance, LubricationTroubleshooting Problem Possible Causes Likely SolutionsParts List Part Description QtyAssembly Drawing Limited 90 DAY Warranty Record Product’s Serial Number Here