Bradley Smoker S19-220 Assembly of Components and Parts List, Flow Control This End

Page 4

S19-220

Installation

Assembly of Components and Parts List

1.8

8

1.7

 

 

 

1.6

1

 

 

 

 

 

1.5

 

 

 

Flow Control

 

 

9

This End

 

 

1.4

P.O. Box 309, Menomonee Falls, WI 53051

TEST THIS UNIT EACH WEEK

 

 

 

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.

 

ESSAI HEBDOMADAIRE

 

 

 

Test-operate valve(s) each week and sign below.

 

Report any malfunctions immediately.

 

 

Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt

 

durch Unterschrift. Jegliche Störung sofort melden.

 

Test le fonctionnement des valves chaque semaine et

 

signe en bas. S'il y à quelque chose qui ne va pas fait

 

un rapport immédiatement.

 

 

 

Date Signed

Date

Signed

 

Datum Unterschrift

Date

Signed

1.3

Date Signe

Date

Signed

 

 

 

1.2

1/2" NPT

 

 

Supply Inlet

 

 

 

 

 

1.1

4

6

 

2

7

3

5

1-1/4" NPT

4.1

Drain Outlet

NOTE: Items 1.1-1.8 come preassembled as Item 1.

Item

Part No.

Qty

Description

Item

Part No.

Qty

Description

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

S90-293

1

Plastic Bowl Assembly

2

113-006LQ

1

1/2” NPT Pipe x 3-1/2”

 

 

 

 

 

 

 

 

1.1

111-061

1

Inlet Drain Fitting

3

169-025

1

Elbow

 

 

 

 

 

 

 

 

1.2

124-028

1

Gasket

4

S27-282

1

1/2” Ball Valve with Nut

 

 

 

 

 

 

 

 

1.3

154-058

1

Plastic Receptor

4.1

110-215

1

Nut only

 

 

 

 

 

 

 

 

1.4

173-025

1

Cup Strainer

5

128-135

1

Handle, Plastic

 

 

 

 

 

 

 

 

1.5

S21-071

1

Supply Stem

6

142-002DA

1

Washer

 

 

 

 

 

 

 

 

1.6

113-1185

1

Spacer, Drain

7

269-167

1

Tailpiece

 

 

 

 

 

 

 

 

1.7

S05-091

1

Eyewash Yoke Assembly

8

114-051

1

Safety Sign

 

 

 

 

 

 

 

 

1.8

107-371

2

Dust Cover

9

204-421

1

Inspection Tag

 

 

 

 

 

 

 

 

Prepack S45-123 includes Items 4.1, 5, 6

Prepack S45-122 includes Items 4, 4.1, 5, 6

Prepack S45-1785 includes Items 1.2, 1.4, 1.5, 1.6

4

2/4/08

Bradley Corporation • 215-158 Rev. W; ECN 08-503

Image 4
Contents Installation S19-220 Installation Installation Install inlet drain fittingSupplies Required Assemble componentsAssembly of Components and Parts List Flow Control This EndNPT Supply Inlet 4 NPT Drain Outlet Qty DescriptionInstallation Étape 1 Installer le raccordement d’entrée du drain Equipements nécessairesÉtape 2 Assemblage des composantes de la douche oculaire Étape 3 Raccorder l’approvisionnement en eauAssemblage des composantes Flow ControlNPT Piéce Réf Qté DescriptionImportante Instalación Materiales necesariosPaso 1 Instale el accesorio de entrada del drenado Paso 2 Armado de los componentes del lavador de ojosSupply Inlet Armado de los componentesArt Pieza N Cant Descripción