Grizzly G0475, G0474 owner manual Assembly, To assemble the sandblaster

Page 10

Assembly

To assemble the sandblaster:

1.Install the wheels, handles, and leg to the tank with the screws, washers, nuts, and cotter pins as shown in Figure 1.

Figure 1. Wheel and handle installation.

2.Seal all pipe threads with Teflon tape, and assemble and install one of the four ball valves to the bottom of the tank with two 38" nipples, and the sand outlet elbow as shown in Figure 2.

Tank

38" Nipple

Ball Valve

38" Nipple

Sand

Outlet

Elbow

Figure 2. Sand outlet control installation.

-8-

3.Assemble one of the remaining three ball valves with a 38" hose nipple, and the nozzle arbor as shown in Figure 3.

4.Install one of four sand blasting nozzles into the nozzle arbor as shown in Figure 3.

Nozzles

Ball Valve

Nozzle

Arbor 38" Hose Nipple

Figure 3. Sand blaster handle and nozzle

assembly.

5.With the two hose clamps, secure the sandblaster hose to the sand outlet elbow and the sand blaster nozzle assembly as shown in Figure 4.

Sand Blaster Nozzle Assembly

Hose

Hose Clamp

Outlet Elbow

Figure 4. Sand blaster hose installation.

G0474/G0475 Sandblasters

Image 10
Contents Model G0474 20-GALLON Page Table of Contents Foreword IntroductionContact Info Machine Data Safety Safety Instructions for MachineryAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety Instructions for Sandblasters Items Needed for Set Up SET UPSet Up Safety UnpackingAssembly To assemble the sandblasterWater separator assembly G0474/G0475 Sandblasters Operations Operation SafetyBasic Operation Tank air supply valve, opened G0474/G0475 Sandblasters Abrasive Options MaintenanceNozzle Options Parts Breakdown Parts List DescriptionWarranty and Returns Warranty Card Grizzly INDUSTRIAL, INC