Assembly
To assemble the sandblaster:
1.Install the wheels, handles, and leg to the tank with the screws, washers, nuts, and cotter pins as shown in Figure 1.
Figure 1. Wheel and handle installation.
2.Seal all pipe threads with Teflon tape, and assemble and install one of the four ball valves to the bottom of the tank with two 3⁄8" nipples, and the sand outlet elbow as shown in Figure 2.
Tank
3⁄8" Nipple
Ball Valve
3⁄8" Nipple
Sand
Outlet
Elbow
Figure 2. Sand outlet control installation.
3.Assemble one of the remaining three ball valves with a 3⁄8" hose nipple, and the nozzle arbor as shown in Figure 3.
4.Install one of four sand blasting nozzles into the nozzle arbor as shown in Figure 3.
Nozzles
Ball Valve
Nozzle