All installations and services must be performed by qualified service personnel.
Control System Action
OPB | 2 of 2 |
Main Burner
Operation
Repeat Ignition
Trial
Call for Heat
Satisfied
System Lockout
End of Cycle
After 45 second delay, the ignition electrodes are de- energized. The circulating air fan is energized at heating speed. The (optional) electronic air cleaner & humidifier are energized.
When thermostat is satisfied,
contacts open and the oil
valve is
After the
If ignition attempt is unsuccessful, the ignition control module goes into system lockout.
If system is in lockout,(check if LED is flashing fast) try to recycle the system by depressing the RESET button on the ignition control module.
76