Soleus Air SG-WAC-15ESE manual THRU-THE-WALL Installation, Installing the Chassis into the Cabinet

Page 11

ASSEMBLY & INSTALLATION (CONT.)

Installing the Chassis into the Cabinet

1.Team lift (two people) the air conditioner chassis and carefully slide it into the cabinet. Let the front of the air conditioner hang out approximately 6”.

2.DO NOT PUSH ON THE CONTROLS OR FINNED COILS.

3.Be sure the chassis is firmly seated in the back of the cabinet.

4.Insert all screws removed during window installation and reattach the front face plate, front panel, and the air filter. Use the REMOVE CHASSIS instructions and figures 1-6 for reference.

THRU-THE-WALL INSTALLATION

NOTE: Consult local building codes prior to installation and/or a qualified carpenter.

Select the Wall Location

This air conditioner has a slide-out chassis, so that it can be installed through an outside wall as specified below:

Model

SG-WAC-25ESE

SG-WAC-15ESE /

 

 

SG-WAC-18ESE

 

 

 

Max Wall

12”

10”

Thickness

 

 

 

 

 

IMPORTANT: The side louvers must never be blocked.

NOTE: All parts needed for Thru-The-Wall Installation are provided, except a wood frame, shims, and 10 wood screws (10-1” long minimum). Select a wall surface that:

1.Does not support major structural loads such as the frame construction at ends of windows, and under truss-bearing points, etc.

2.Does not have plumbing or wiring inside.

3.Is near existing electrical outlets, or where another out- let can or will be installed.

4.Does not have objects blocking the air vents which limits cooling.

5.Allows unblocked airflow from the rear and sides of the air conditioner.

Prepare the Wall

1.Prepare the wall in frame construction (including brick and stucco veneer). Working from inside the room, find the wall stud that is nearest the center of the installa- tion area.

FIG. 1

10

Image 11
Contents SG-WAC-15ESE SG-WAC-18ESE SG-WAC-25ESE Page Important Safety Instructions It is the customer’s responsibility Lcdi Power Cord and PlugElectrical Requirements Recommended Ground MethodTools Needed Parts ListCFM SpecificationsModel EER/C.O.PStorm Window Requirements Installation & Assembly InstructionsPrior to Installing the Air Conditioner Window PreparationRemove Chassis Installation & Assembly Instructions Window MountingPlacing the Cabinet Inside the Window Assembly & InstallationTop Angle Rail and Side Bracket Installation TOP ViewExtend the Accordion Panels Install Support BracketsInstall the Window Lock and Sash Seal MarkPrepare the Wall THRU-THE-WALL InstallationInstalling the Chassis into the Cabinet Select the Wall LocationWindow Mounting Section Assembly & Installation THRU-THE-WALLPrepare and Install the Cabinet Support Bracket Wooden Strip Masonry ConstructionAir Conditioner Controls Using Your AIR ConditionerElectronic Control Panel & Remote Control Remote Control Normal Operating SoundsUsing Your AIR Conditioner Winter Storage Care and CleaningAir Filter Cleaning Cabinet CleaningProblem Possible Causes Solutions TroubleshootingWater collects in the base pan Problem Possible CausesWater is dripping outside Water is dripping inside the roomOne Year Limited Warranty Warranty66129903756