CPU Software Version Numbers

Appendix B Installation Checklists

A simplified guide for those who are already familiar with installing and program- ming Allegiant systems.

MAIN BAY HARDWARE INSTALLATION

Unpack equipment and verify that items have been received without carrier damage.

 

 

Install power supply (do not turn ON) and CPU module.

 

 

If applicable, install bay into EIA 19-inch rack (remember to remove rubber bumper

 

foot pads.

 

 

Install video input module(s) following proper termination procedures. Install video

 

output module(s).

 

 

Connect camera inputs and monitor outputs to appropriate connections on equip-

 

ment bay(s).

 

 

Connect system keyboards, any alarm interface unit(s), and any signal distribution

 

unit to the main bay.

 

 

Set CPU DIP switches to activate desired features.

 

 

Apply main AC power to equipment.

 

 

Verify system is operating properly then begin appropriate programming.

 

 

PROGRAMMING VIA SYSTEM KEYBOARD

Enter system time (User Function 7) and date (User Function 8). Enter Camera ID titles (User Function 9), and if desired, adjust monitor overlay displays (User Function

4, 5, & 6 or 24, 25 & 26).

Enter desired Sequences.

Configure and test alarm response mode.

SATELLITE CONFIGURATION HARDWARE INSTALLATION

Main Site:

Install main Allegiant bay and appropriate accessory products accordingly. Verify the biphase control code line is run to each satellite site.

Attach trunk line inputs, local camera inputs, and monitor outputs to the main Alle- giant bay. Apply main AC power to equipment.

Program Camera ID Table using the LTC 8059 MCS package.

Switch all unused monitor outputs located at the main site to display a 'local' cam- era input.

Satellite Site(s):

Install satellite switcher and appropriate accessory products accordingly.

Connect the biphase code line to the LTC 8780 Data Converter unit and configure according to the desired satellite address and switcher's baud rate.

If necessary, program the satellite switcher for the desired camera titles and any other related requirements.

EN 85

Page 95
Image 95
Bosch Appliances 8500, LTC instruction manual Appendix B Installation Checklists, Main BAY Hardware Installation