Introduction
Installation Instructions
Glass door panels
To meet the relevant Standards of Domestic cooking appliances, all the glass panels on this appliance are toughened to meet the fragmentation requirements of BS3193. This ensures that, in the unlikely event that a panel breaks, it does so into small fragments to minimise the risk of injury.
Please take care when handling, using or cleaning all glass panels as any damage to the surfaces or edges may result in the glass breaking without warning or apparent cause at a later date. Should any glass panel be damaged, we strongly recommend that it is replaced immediately.
Before using the appliance for the first time, remove any protective polythene film and wash the oven shelves in hot soapy water to remove their protective covering of oil. Even so, when you first switch on the oven or grill you may notice a smell and some smoke.
Condensation
When hot and cold air meet, condensation forms. The outer door is air cooled and the inner door gets hot, so some condensation might form; this is normal and will disappear within 10 - 15 minutes.
To replace a light bulb (if fitted)
Caution: Switch off the electricity supply to the appliance, to avoid the possibility of electric shock.
Wait until the oven is cool, then remove the shelves.
Unscrew the lens cover (turn anticlockwise). Unscrew the bulb and replace. Replace lens cover.
Please note that light bulbs are not covered by guarantee.
Environmental Protection
We are committed to protecting the environment and operate an Environmental Management System which complies with BS EN ISO 14001:1996.
Disposal of packaging
●All our packaging materials are recyclable and environmentally friendly.
●Please help us to protect our environment by disposing of all packaging in an environmentally friendly manner.
●Please contact your local authority for the nearest recycling centre.
Caution: Packaging materials can pose a risk of suffocation - keep away from children.
Step 5: Commissioning
Pressure test point
Use the oven burner. From inside the oven remove the burner cowl. Remove the small screw at the LHS of the burner cradle. Slide the burner to the left to access the injector.
Connect suitable
Replace in reverse order.
Burner aeration
All burners have fixed aeration and no adjustment is possible.
Pressure setting
Cat I2H G20 Natural Gas @ - 20mbar
Electrical systems check
In the event of an electrical fault the preliminary electrical system check (earth continuity, short circuit, polarity and resistance to earth) must be carried out.
Oven
1.Push in and turn the control knob anticlockwise to gas mark 9.
2.Adjust to the required setting.
3.The burner may not come on to a full rate unless the oven door is closed.
The oven burner operates at a low rate for up to 60 seconds until the flame supervision device opens and full gas rate is obtained.
Grill
1.The door must be open for the grill burner to ignite.
2.Push in and turn the control knob clockwise to the grill symbol.
3.Close the door, and check that the burner goes out.
The grill burner will
Before leaving the installation
Show the customer how to ignite the oven and grill and give them this handbook. Thank you.
4 | 29 |