HP Performance Optimized Data Center (POD) 20cp manual Supported facility connections

Page 19

Supported facility connections

Humidifier specifications

A dedicated supply of domestic water is required if the optional humidifier is installed. For exact requirements for the humidifier model that was installed, see the humidifier manual supplied with the HP POD.

Item

1

2

Component

Humidifier drain

Water supply

For more information about the humidifier, see the documentation developed by the humidifier manufacturer.

Convenience outlets

The HP POD is prewired for a convenience outlet on the inside of the unit. This circuit is not part of the power provided by the main switchboard feeding the 3-phase power to the HP POD. To energize this circuit, you must supply a dedicated single phase, 16-or 20-amp branch circuit from your facility at the appropriate voltage. Make sure that the branch circuit is connected to the prewired exterior mounted junction box and must be wired in accordance with local regulations and codes.

Grounding requirements

The neutrals and equipment grounding conductors for all 3-phase HP POD feeders must remain isolated. The two conductors can be bonded at the power source only.

Supported facility connections 19

Image 19
Contents Part Number March 2010 Second Edition Intended audience Contents Site preparation Safety informationSite requirements About this documentSystem utilities PowerComponent Drainage Environmental considerations Environmental specificationsFeatures Specifications Optional connections to central facility infrastructureLightning protection Required clearances HP POD specificationsDimensions WeightWater input side view Component Top view ComponentExternal cold aisle view Component Double door end view ComponentInternal components External hot aisle view Callout FeatureComponent backwall Control cabinet interior ComponentFeature Specification Water supply specificationsAcceptable water quality specifications Water quality requirements and specificationsWater quality requirements Condensation management Water precautionsPiping materials Connection requirements Power managementPower requirements Main input powerMain input power details Grounding requirements Humidifier specificationsSupported facility connections Convenience outletsHP POD security IT cable portalsHP POD Environmental Control System POD Fire, safety, and security notificationsAcronyms and abbreviations
Related manuals
Manual 86 pages 43.14 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb Manual 38 pages 28.4 Kb