•You have chilled water at your final location.
•You have made provisions for properly grounding the HP POD.
System utilities
Your site location must accommodate the following utilities:
•Cooling water
•Electrical power
•Drainage
Power
Item | Component | |
|
| |
1 | Chilled water supply connection | |
|
| |
2 | Chilled water return connection | |
|
| |
3 | External communication box (if fitted) | |
| • | ECS |
| • | Fire |
| • | Security |
| • | Telephone |
|
|
|
Site requirements 5