Sterling 882.004400.00 specifications Shipping Information

Page 2

Shipping Information

Unpacking and Inspection

You should inspect your equipment for possible shipping damage. Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc.

In the Event of Shipping Damage

According to the contract terms and conditions of the Carrier, the responsibility of the Shipper ends at the time and place of shipment.

Notify the transportation company’s local agent if you discover damage

Hold the damaged goods and packing material for the examining agent’s inspection. Do not

return any goods before the transportation company’s inspection and authorization.

File a claim with the transportation company. Substantiate the claim by referring to the agent’s report. A certified copy of our invoice is available upon request. The original Bill of Lading is attached to our original invoice. If the shipment was prepaid, write us for a receipted transportation bill.

Advise customer service regarding your wish for assistance and to obtain an RMA (return material authorization) number.

If the Shipment is Not Complete

Check the packing list as back-ordered items are noted on the packing list. In addition to the equipment itself, you should have:

;Bill of lading

;Packing list

;Operating and Installation packet

;Electrical schematic and panel layout drawings

;Component instruction manuals (if applicable)

Re-inspect the container and packing material to see if you missed any smaller items during unpacking.

If the Shipment is Not Correct

If the shipment is not what you ordered, please contact the parts and service department immediately at (262) 641-8610. Have the order number and item number available.

Hold the items until you receive shipping instructions.

Returns

Do not return any damaged or incorrect items until you receive shipping instructions from the shipping department.

Fiberglass Cooling Towers

ii

Image 2
Contents SF Series Fiberglass Cooling Towers Shipping Information Table of Contents Parts List Electrical Schematics List of Figures Structural Steel Support RequirementsSafety Symbols Used in this Manual SafetyHow to Use This Manual Responsibility Models Covered in This Manual Standard FeaturesFunctional Description General DescriptionOptional Features Roof Installation InstallationTower Installation Location Ground InstallationStructural Steel Support Requirements Assembling the Cooling Tower in the Field Rigging Installing the Fan PackageInstalling Piping Cooling Tower with Tower Reservoir Piping Diagram Flexible PVC Outlet Coupler Setting Up the Water Balancing Valve Initial Start-upWinter Operation Considerations OperationBleed-Off and Evaporation Rates Routine Maintenance MaintenancePreventative Maintenance Water TreatmentCorrective Maintenance Replacing Nozzles and FillTechnical Assistance Service Department Sales DepartmentAppendix Parts DepartmentDrawings and Specifications Side ViewTower Performancec Nozzle 1D Parts List SF2004 SF2005 d SF2007 SF2009 SF2011 SF2015 Description QtyElectrical Schematics Typical Wiring Diagram

882.004400.00 specifications

The Sterling 882.004400.00 is a remarkable piece of technology that caters to various sectors including industrial applications, transport, and construction. Known for its robust design and innovative features, this equipment is engineered to improve efficiency and productivity while maintaining a high standard of reliability.

One of the main features of the Sterling 882.004400.00 is its powerful engine. This engine provides exceptional performance, enabling the machine to handle heavy workloads with ease. The capacity of the engine allows for quick acceleration and high torque, making it ideal for both short bursts of speed and prolonged use under load.

The machine incorporates advanced hydraulic technology which enhances its operational capabilities. The hydraulic system ensures smooth operation, allowing for precise control over various functions. This technology also contributes to the overall longevity of the equipment, reducing wear and tear over time, and minimizing maintenance requirements.

In terms of design, the Sterling 882.004400.00 is constructed with high-quality materials that promote durability and resilience. The chassis is both lightweight and sturdy, allowing for excellent maneuverability without compromising on strength. Its design also prioritizes operator comfort, featuring an ergonomic cabin that reduces fatigue during extended use.

The equipment comes with an array of safety features designed to protect both the operator and the machine. Advanced braking systems, safety alarms, and protective guards are incorporated to enhance operational safety. Additionally, the visibility from the operator’s cabin has been optimized to provide an unobstructed view of the working environment, which is essential for safe maneuvering.

Technologically, the Sterling 882.004400.00 is equipped with state-of-the-art control systems that promote ease of use. These systems allow users to fine-tune performance settings based on specific operational requirements, ensuring optimal functionality in various conditions.

Energy efficiency is another significant characteristic of this machine. It integrates technologies designed to minimize fuel consumption while maintaining high output. This not only reduces operational costs but also contributes to environmental sustainability.

In summary, the Sterling 882.004400.00 stands out in its category thanks to its powerful performance, advanced hydraulic technology, robust design, safety features, and commitment to energy efficiency. Whether in industrial or construction settings, this machine promises to enhance productivity while delivering the reliability that operators need.