Working Instruction
| Document No. : SOP VV09 FA | Station : 20(1/1) | |||
|
|
|
|
|
|
| Name : Take down RAM and 15“ ODD extension board Ver. : | 1.00 | Date : 2009/05/18 | ||
| |||||
|
|
|
| ||
| Fig.1 |
|
|
| |
|
|
|
|
|
|
1. Put MB on supporting fixture.
2. Take down DDR 。(IF have two , need disassemble the two DDR)
3.Tear the tape of acetic acid
(6054A0076201 ) *1 and gasket
(6054B0430101 )*1 from RJ11 Cable . (Fig.2)
Fig.2 | FOR 15” ONLY | |||
|
|
| tape of acetic acid | 4. Take down 15“ ODD extension board |
|
|
|
| , Fig.3。 |
|
|
|
| |
|
|
| gasket |
|
|
|
|
|
|
Fig.3
Point for attention: If finding some defects, notice the gaffer and assistant
Fixture list(Fixture standard) | Qty | Fixture list(Fixture standard) | Qty |
|
|
|
|
Automatic crossing screw driver | 1 |
|
|
VV09 M/B B side supporting fixture
1
Zhang Ying | Issuing department: IE |
Tabulator:_________ |