York PV8*DH Furnace Cleaning Section, Burner Removal/Cleaning, Cleaning the Heat Exchanger

Page 5

271015-UUM-A-0407

FURNACE CLEANING SECTION

NOTE: The cleaning operations listed below must be performed only by a qualified service agency.

Burner Removal/Cleaning

The main burners should be checked periodically for dirt accumulation. If cleaning is required, follow this procedure:

1.Turn off the electrical power to the unit.

2.Turn off the gas supply at the external manual shut-off valve and loosen the ground union joint.

3.Remove the upper access panel and remove the burner box cover.

4.Disconnect wires from flame sensor, rollout switch and HSI igniter. Remove igniter carefully, as it is easily broken.

5.Remove the screws that hold the burner box assembly to the vest panel and remove the assembly.

6.Remove burners from the burner assembly.

7.Burners may be cleaned by rinsing in hot water.

8.Reassemble the burners in the reverse order.

Cleaning the Heat Exchanger

Lower Heat Exchanger Access

1.Turn off the electrical power to the unit and turn off gas supply at the shutoff valve.

2.Remove the blower and burner compartment access doors. Dis- connect the gas supply piping at the union to permit removal of the entire burner and gas control assembly from the vestibule panel. Use the wrench boss on the gas valve when removing or installing this piping. See Figure 4.

3.Unplug the igniter from the wire harness. Disconnect sensor and rollout switch wires located on top of the air shield. Identify and note the location of all leads for ease of reinstallation. Also discon- nect the wires at the side rollout switches (upflow only) and the gas valve wires.

4.Remove the screws holding the burner assembly to the vestibule panel and remove this assembly. Handle the assembly carefully since it contains the igniter, which is fragile and easily broken. The lower portion of the heat exchanger will now be exposed. To clean the burner assembly, use a vacuum cleaner, or remove the burn- ers as outlined in burner cleaning, and clean in hot water.

Upper Heat Exchanger Access

1.Perform steps 1-4 above.

2.Disconnect vent piping from the vent motor assembly at the top panel on the furnace (upflow only). On downflow models, the vent pipe is attached to the vent motor outlet. Remove this screw before proceeding.

3.Unplug the vent motor wires and ground wire. Remove the pres- sure switch tubing at the tap on the vent motor housing.

NOTE: It is recommended that replacement gaskets be available before removing vent motor.

4.Remove six mounting screws that hold the vent motor to the restrictor plate. The surface is gasketed and gasket can be reused if it is carefully removed. It is necessary to remove this assembly to gain access to the restrictor plate mounting holes. The assembly may be vacuumed if cleaning is necessary. If any vent assembly parts are damaged, replace with an entire new assembly (except for gaskets).

5.Remove the perimeter screws attaching the restrictor plate assem- bly to the vestibule panel. The surface is also gasketed. The assembly, including the flue baffle plate (rear) may be vacuumed or cleaned with hot water if necessary.

6.The upper portion of the heat exchanger is now accessible. With a long flexible wire brush, clean inside each tube at both the top and bottom. The brush must pass around the rear heat exchanger tubes. Vacuum loose scale and dirt from each tube.

7.Clean - Replace all components in reverse order. Re-gasket all surfaces which required a gasket. Reconnect all wiring. Reattach vent pipe and gas supply lines before restoring service to furnace. Restore electrical power, check gas supply piping for leaks, and then verify furnace operation.

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and danger- ous operation. Verify proper operation after servicing.

SEQUENCE OF OPERATION

The following describes the sequence of operation of the furnace. Refer to Figure 1 for component location.

1.Call for 1st stage only

On a call for 1st stage heat, the thermostat closes a circuit between R and W1.

The Microprocessor in the Furnace Control runs a ‘Self Check’.

The Control checks the Primary Limit, Auxiliary Limit, and Roll- out Switches for closed contacts.

The Control checks that the Low Fire Pressure Switch (1LP) is open.

The Inducer Motor is energized on high speed, closing the con- tacts of 1LP.

The Control checks that 1LP is closed.

The Igniter is energized for 17 seconds.

The Gas Valve is energized on 1st Stage (Low Fire).

Flame Rectification is recognized within 7 seconds.

The Inducer is switched to low speed.

30 seconds after flame is proven, the ‘Heat Low’ relay is ener- gized providing 120 Volts AC to the Blower Motor.

At the same time, the EAC and Hum relays are energized, pro- viding 120 Volts AC to the EAC Hot and Hum terminals.

2.Call for 2nd Stage after 1st Stage is operating

A call for 2nd Stage can be made by a 2-Stage thermostat, or by the W2 delay timer on the furnace control.

The Inducer Motor is shifted to high speed by the control, closing the contacts of 2LP (The High Fire Pressure Switch.).

The Control checks that 2LP is closed.

The Gas Valve is energized on 2nd Stage (High Fire).

The Control simultaneously de-energizes the Heat Low relay and energizes the Heat High relay, providing 120 Volts AC to a different speed of the Blower Motor.

3.2nd Stage is satisfied, 1st Stage still calling.

If a Single Stage Thermostat is used, the Furnace will stay on High Fire until the thermostat is satisfied.

When the circuit between R and W2 is opened, the Control switches the Inducer Motor to low speed, causing the contacts of 2LP to open.

When 2LP opens, 2nd Stage of the Gas Valve is de-energized.

30 seconds later, the Control switches the Blower from Heat High to Heat Low.

4.1st Stage Satisfied

The Thermostat opens the circuit between R and W1

Immediately the Gas Valve is de-energized and Flame Rectifica- tion is lost.

The Inducer Motor is de-energized after a 15 second Post Purge and the Hum terminal is de-energized.

The ‘Fan Off Delay’ circuit is initiated. The Delay time can be field set at 60, 90, 120, or 180 seconds. It comes from the fac- tory set at 60 seconds.

The Heat Low terminal is de-energized; stopping the Blower and the EAC terminal is de-energized.

Unitary Products Group

5

Image 5
Contents Safety Table of ContentsContact Information What to do if YOU Smell GASFire or Explosion Hazard Instructions for Examining the Furnace InstallationHOW Your GAS Furnace Works Furnace User MaintenanceSTART-UP and Shutdown Instructions Operating InstructionsFurnace Maintenance Section Safety SectionBurner Removal/Cleaning Furnace Cleaning SectionCleaning the Heat Exchanger Sequence of OperationHeating Indoor Fan Off Delay Adjustment of FAN Control SettingsControl Board Heating AirflowFurnace Control Diagnostics TroubleshootingIgnition Control Diagnostic Fault Code Storage and RetrievalFurnace Control Event Schedule Section III Replacement Parts List AIR Moving Model no Description Used with Replacement Part Contact InformationSection IV Wiring Diagram UUM-A-0407 UUM-A-0407 Unitary Products Group 80% ExclusionsUnitary 5005 Norman Products York Group Drive 73069

LL8V*DH, LC8V*DH, FL8V*DH, FC8V*DH, PV8*DH specifications

The York FL8V*DH, LC8V*DH, PV8*DH, LL8V*DH, and FC8V*DH series represent a range of advanced heating and cooling solutions tailored to meet the needs of both residential and commercial applications. These units are engineered with cutting-edge technologies that enhance energy efficiency, performance, and user comfort, making them a top choice for HVAC needs.

One of the standout features of these systems is their high-efficiency design, which often exceeds industry standards. The FL8V*DH, for example, boasts an impressive SEER (Seasonal Energy Efficiency Ratio) rating, allowing users to save on energy costs while ensuring optimal heating and cooling comfort. The innovative design minimizes energy consumption without compromising performance, which is critical in today’s eco-conscious market.

Another hallmark of these series is their use of advanced refrigerant technology. Utilizing environmentally friendly refrigerants, such as R-410A, these units deliver excellent heat transfer while reducing the overall carbon footprint. This focus on sustainability ensures that customers can feel good about their choice, contributing positively to the environment.

The technology behind these models extends to their variable-speed blower motors, which provide precise airflow and temperature control. This flexibility allows adjustments based on real-time demand, enhancing comfort and reducing energy usage. The use of smart thermostats with these systems enables users to program schedules, monitor usage, and optimize settings remotely, further improving efficiency.

In terms of durability and reliability, the York series is built from high-quality materials designed to withstand the test of time. Robust construction minimizes maintenance needs, resulting in lower long-term ownership costs. Additionally, many units feature quiet operation technologies, ensuring minimal noise disturbance, which is particularly important in residential settings.

Moreover, installation and servicing of the York FL8V*DH, LC8V*DH, PV8*DH, LL8V*DH, and FC8V*DH systems are made simpler through their user-friendly designs. Easy access points for maintenance staff help to reduce downtime and enhance system longevity.

Overall, the York FL8V*DH, LC8V*DH, PV8*DH, LL8V*DH, and FC8V*DH units stand out due to their efficiency, innovative technology, durability, and user-friendly design, marking them as exceptional choices in the HVAC market. These systems not only provide comfort but also align with energy-saving initiatives, making them a wise investment for the future.