York D2EG 048, D3EG 036, D2EG 060 installation instructions

Page 20

Unitary Products Group

 

 

5005 York Drive, Norman Oklahoma 73069

 

 

Subject to change without notice. Printed in U.S.A.

Supersedes: 035-14832-002-A-0302

035-14832-003-A-0204

Copyright by York International Corporation 2004. All Rights Reserved.

Image 20
Contents For Your Safety GeneralInspection ReferenceTable of Contents Installation Service Access Power and Control WiringFilters Condensate DrainDisconnect Switch Bracket for Units With Optional BELT-DRIVE BracketPipe Sizing GAS PipingExternal SHUT-OFF GAS ConnectionPropane UNITS, Tanks and Piping LOW NOx ApplicationVent and Combustion AIR Hoods Optional Economizer Rain HoodSide Duct Application ShownPhysical Data Model AIR Flow DEG CFM RPM894 885 940 980 1014 1020 1047 1095 855 815 903 860 950 905 988 940 1022 970884 815 925 850 964 880 1001 910 864 770 908 805 948 835 987 870Static Resistances Blower Circuit Size Breaker DEG Supply Motor AmpacityMIN MAX RLA LRA FLA AmpsUtilities Entry Data AIR Flow LegendDetail a Detail BOperation Cooling SystemPreliminary Operation Cooling Cooling Sequence of OperationSTART-UP Burner AIR Shutter Adjustment Supply AIR AIR Blower and Temperature Rise AdjustmentsPilot Checkout Burner InstructionsChecking GAS Input GAS Rate Cubic Feet PER HourNatural GAS Seconds Size of Test Dial For One Cu. ftMaintenance Normal MaintenanceCleaning Flue Passages and Heating Elements StructionsTroubleshooting Troubleshooting