HP w8000 manual Installing and Removing an Expansion Board, Identifying the PCI and AGP Sockets

Page 49

Hardware Upgrades

Installing and Removing an Expansion Board

This section provides instructions for installing and removing PCI and AGP expansion boards.

Identifying the PCI and AGP Sockets

This workstation contains one AGP socket and six PCI sockets. The following illustration identifies the physical locations of these sockets.

Identifying AGP and PCI sockets

1One 1.5V AGP Pro socket

2

Four 32-bit, 33-MHz PCI sockets; primary bus

T

 

h

Two 64-bit, 66-MHz PCI sockets; secondary bus

3

Evo Workstation W8000 supports 4X AGP Pro cards only. Older type AGP cards (3.3V) are not supported and will NOT fit in the AGP socket.

2-34

Compaq Evo Workstation W8000 Hardware Reference Guide

Image 49
Contents Hardware Reference Guide Rack Stability Contents Battery Replacement Specifications Hard Drive InstallationSecurity Lock Provisions Electrostatic DischargeRoutine Computer Care and Shipping Preparation Standard Configuration Features Product FeaturesFront panel components Front Panel ComponentsRear panel components Rear Panel ComponentsSystem board components System Board ComponentsProduct Features Audio System Keyboard Easy Access KeyboardReprogramming the Easy Access Buttons Easy Access SoftwareLocking and Unlocking the Easy Access Buttons Windows Logo Key Easy Access Paper Icon InsertSerial Number Location Special Mouse FunctionsInstallation Sequence Hardware UpgradesHardware Upgrades Removing the Workstation Access Panel Removing the Front Bezel Installing Additional Memory Location of Rimm sockets Memory Expansion BoardRemoving the Memory Expansion Board Removing the torx screw on the back of the metal slot cover Hardware Upgrades Rimm Installation Guidelines Rimm InstallationHardware Upgrades Configuration 2 Two Pairs of RIMMs Configurations for Rimm InstallationConfiguration 3 Three Pairs of RIMMs Installing RIMMsHardware Upgrades Installing a Rimm and a Crimm Reinstalling the Memory Expansion Board Installing a memory expansion board Securing the memory expansion board Drive Bay Components Installing Additional DrivesDrive Bay Components Removing the Bezel Blank Preparing for Drive InstallationRemoving the Removable Hard Drive Cage Removing and Replacing the Removable Hard Drive CageRemoving the Cooling Shield Replacing the Removable Hard Drive CageRemoving a cooling shield Locating the Hardware Screws Installing a hard Drive in Bays 5 Installing a DriveInstalling a hard drive in the hard drive adapter Hardware Upgrades Connecting the Uata signal cable and power cable Hardware Upgrades Locating the hard drive screw holes Hardware Upgrades Connecting the Scsi signal cables and power cables Identifying the PCI and AGP Sockets Installing and Removing an Expansion BoardInstalling an Expansion Board Installing an expansion board Removing an Expansion Board Installing an Additional ProcessorRemoving the air baffle Installing a second processor Installing a second VRM board and clip Reinstalling the air baffle Hardware Upgrades Upgrading a Processor Preparing for a Processor UpgradeHardware Components Required Heatsink Cool-Down Time Guidelines for Separating the Heatsink/Processor AssemblyHeatsink Warm-Up Time Removing an Existing ProcessorEnsure that the heatsink is warm to the touch Twisting and lifting the heatsink off the processor Disabling Onboard Devices Installing a New ProcessorEvo Workstation W8000 SpecificationsUsing the Cable-Select Feature with Ultra ATA Devices Hard Drive InstallationUATA-100 cable Guidelines for Installing Ultra ATA DevicesScsi Devices Guidelines for Using Scsi DevicesHard Drive Installation Scsi Controllers Guidelines for Installing Scsi DevicesScsi Cables Using a Scsi Cable Using SCSISelect with Scsi Devices Replacing the Battery Battery ReplacementLift the battery out of its holder Battery Replacement Security Lock Provisions Installing a Cable LockSecurity Lock Provisions Preventing Electrostatic Damage Electrostatic DischargeGrounding Methods Routine Computer Care Routine Computer Care Shipping PreparationCleaning CD-ROM Drive PrecautionsSafety OperationShipping Preparation Cooling shield IndexFunctions Windows Logo Key