United States Stove 58242 owner manual Vent Termination Clearances

Page 8

Installation

VENT TERMINATION CLEARANCES:

A)Minimum 4-foot clearance below or beside any door or window that opens.

B)Minimum 1-foot clearance above any door or window that opens.

C)Minimum 3-foot clearance from any adjacent building.

D)Minimum 7-foot clearance from any grade when adjacent to public walkways.

E)Minimum 2-foot clearance above any grass, plants, or other combustible materials.

F)Minimum 3-foot clearance from an forced air intake of any appliance.

G)Minimum 2-foot clearance below eves or overhang.

H)Minimum 1-foot clearance horizontally from combustible wall.

I)Must be a minimum of 36-inches above the roof and 24-inches above the highest point or the roof within 10-feet.

G

FIGURE 5

VENT TERMINATION CLEARANCES

8

USSC

Image 8
Contents Ussc Table of Contents Safety Precautions Fuel Considerations SpecificationsSafety and EPA Compliance Floor Protection InstallationInstallation Options Clearances AlcovePellet Vent Installation Venting RequirementsMaximum Venting Distance Pellet Vent TypeVent Termination Clearances Through the Wall Installation Recommended Installation Through the ROOF/CEILING InstallationSpecial Mobile Home Requirements Understanding your stove How your stove worksOperation START-UP ProcedureShut Down Procedure Maintenance Safety and Convenience FeaturesDaily Operation Exhaust SystemCheck and Clean the Hopper Interior ChambersASH Disposal Door and Glass GasketsTrouble Shooting ProblemParts Diagram Parts List Wiring Diagram Ussc Ussc