Lochinvar CG200, CG150 warranty Vertical Storage Tank and Forced Circulation

Page 12

VERTICAL STORAGE TANK AND FORCED CIRCULATION

DANGER

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT FIXTURES.

SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 20. IF HIGHER PREHEAT

TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT, ADD AN

ANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

HORIZONTAL STORAGE TANK AND FORCED CIRCULATION

12

Image 12
Contents Models CGN,L150 & CGN,L200 ROUGH-IN-DIMENSIONS Recovery Rating Capacities GPH AT Temperature Rise ShownForeword Table of Contents Features High Altitude InstallationsExtended NON-USE Periods Insulation BlanketsHigh Limit Switch Exhaust Inducer Blower AssemblyElectronic Ignition Control Circulating PumpRequired Ability UncratingLocating the Heater LevelingVenting Confined SpaceMultiple Heater Manifold Water Line ConnectionsWater Potable Heating Space Heating Relief ValveGAS Piping PurgingGAS Pressure Regulator Length Nominal Iron Pipe Sizes Inches FeetHeater Wiring Single Unit Wiring DiagramInstallation Diagrams GeneralVertical Storage Tank and Forced Circulation Horizontal Storage Tank and Forced CirculationPage Circulating Return Line Connection Heater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Operation Sequence of OperationFor Your Safety Read Before Operating What to do if YOU Smell GASPreventive Maintenance Water Temperature ControlCheck the Ignitor Assembly Ignitor AssemblyRemote Storage Tank Temperature Control GAS ValvesChecking the Input Venting SystemHOT Water Odor Anode ROD InspectionFlushing DrainingTank Cleanout Procedure System DiagnosticsDeliming Solvents Ignition Module SystemService Replacement PartsElectrical Servicing Sequence of Operation Flow Chart Ignitor afterOperational Checklist Complaint Cause User ServicemanRemedy Limited Warranty Copyright 2011 Lochinvar, LLC, All rights reserved