SEQUENCE OF OPERATION FLOW CHART
Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section found on page 18.
Switch power on | Ignition |
|
|
Control Board |
|
| |
to unit. | opens Gas |
|
|
| Valve. |
|
|
Thermostat calls | Ignition Control |
|
|
Board shuts off |
|
| |
for heat. | Silicon Nitride |
|
|
| Ignitor after |
|
|
| 3 seconds |
|
|
Ignition Control | Ignition Control |
|
|
Board performs | Board waits 3 more |
|
|
diagnostic check on | seconds to |
|
|
components | monitor Flame |
|
|
| Sensor. |
|
|
Ignition Control |
|
|
|
Board sends power |
|
|
|
to Exhaust Inducer |
|
| Ignition Control |
| Did Main |
| |
| NO | Board shuts off Gas | |
| Burner Light? |
| Valve and allows the |
|
|
| Exhaust Inducer to |
|
|
| purge appliance for |
|
|
| 20 seconds. |
Exhaust Inducer |
|
|
|
engages Prover |
|
|
|
Switch |
|
|
|
| YES |
|
|
| Ignition Control |
|
|
Ignition Control | Board monitors |
|
|
units until T’Stat |
|
| |
Board provides | is satisfied. |
|
|
power to Silicon |
|
|
|
Nitride Ignitor |
|
|
|
Silicon Nitride |
|
|
|
Ignitor |
|
|
|
warms up for |
|
|
|
20 seconds |
|
|
|
| 25 |
|
|