Do not subject the combination gas valve to inlet gas pressures of more than 14.0” W.C. - natural gas. A service regulator is necessary if higher gas pressures are encountered. Manifold gas pressure in inches of water column is 3.5.

The gas pressure specified refers to flow pressure taken at pressure tap of automatic gas valve while heater is operating.

HEATER WIRING

All electrical work must be installed in accordance with the latest version of the National Electrical Code ANSI/NFPA No. 70,

must conform to all local code authority having jurisdiction. AN

ELECTRICAL GROUND IS REQUIRED TO REDUCE RISK OF ELECTRICAL SHOCK OR POSSIBLE ELECTROCUTION.

If any of the original wire as supplied with the appliance must be replaced, use only type 1050C thermoplastic or equivalent. 2500C type F must be used for the flame sensor leads and the spark ignition cable must be high voltage 2500C.

Figures shown are valid for 0-2000 ft. installations. See “HIGH ALTITUDE INSTALLATIONS” for deration requirements over 2000 ft.

FIGURE 10 - SINGLE UNIT WIRING DIAGRAM

10

Image 10
Contents Models CGN,L150 & CGN,L200 Recovery Rating Capacities GPH AT Temperature Rise Shown ROUGH-IN-DIMENSIONSForeword Table of Contents Extended NON-USE Periods FeaturesHigh Altitude Installations Insulation BlanketsElectronic Ignition Control High Limit SwitchExhaust Inducer Blower Assembly Circulating PumpLocating the Heater Required AbilityUncrating LevelingVenting Confined SpaceWater Potable Heating Space Heating Multiple Heater ManifoldWater Line Connections Relief ValveGAS Pressure Regulator GAS PipingPurging Length Nominal Iron Pipe Sizes Inches FeetHeater Wiring Single Unit Wiring DiagramInstallation Diagrams GeneralVertical Storage Tank and Forced Circulation Horizontal Storage Tank and Forced CirculationPage Circulating Return Line Connection Heater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Operation Sequence of OperationFor Your Safety Read Before Operating What to do if YOU Smell GASCheck the Ignitor Assembly Preventive MaintenanceWater Temperature Control Ignitor AssemblyChecking the Input Remote Storage Tank Temperature ControlGAS Valves Venting SystemFlushing HOT Water OdorAnode ROD Inspection DrainingDeliming Solvents Tank Cleanout ProcedureSystem Diagnostics Ignition Module SystemReplacement Parts ServiceElectrical Servicing Sequence of Operation Flow Chart Ignitor afterComplaint Cause User Serviceman Operational ChecklistRemedy Limited Warranty Copyright 2011 Lochinvar, LLC, All rights reserved