Multiquip Qp-2TE manual QP- 2TE Maintenance Pump, Pump Vacuum Test

Page 22

Pump Vacuum Test

CAUTION

DO NOT attempt to start the engine unless the pump has previously been primed with water. Severe pump damage will occur if pump has not been primed.

To perform the pump vacuum test do the following:

1.Remove the pump fill cap (Figure 2), and fill the pump with water.

2.Start the engine as outlined in the initial start-up section, and wait for the pump to begin pumping.

3.As shown in Figure 18 (next page), place a water hose inside the discharge opening of the pump, and turn on the water. This flow of water into the discharge opening will prevent the pump from running dry.

4.Place the Pump Vacuum Tester (P/N 7000030) over the pump suction (inlet) opening (Figure 18) with the vacuum gauge facing upwards. It may be necessary to apply a small amount of water around the rubber seal of the vacuum tester to make a good suction fit.

5.Check and make sure that there are no air leaks between the vacuum tester and the inlet port on the pump. If air leaks are present reset vacuum tester.

6.Run the pump for a few minutes while monitoring the vacuum gauge. If the gauge indicates a reading between -25 and - 20 in. Hg. (inches of mercury) then it can be assumed that the pump is working correctly.

25 in. Hg (inches of mercury)

NOTE translates into 25 feet of lift at sea level.

7.If the vacuum tester gauge indicates a reading below -20 in. Hg, it can then be assumed that the pump is not functioning correctly, and corrective action needs to be taken.

6.To test the flapper valve, shut down the engine.The vacuum tester should remain attached to the pump suction inlet port by vacuum.This indicates the pump's flapper valve is seating properly to hold water in the suction hose when the engine is stopped. This prevents backflow and allows for faster priming when the engine is restarted.

QP- 2TE — MAINTENANCE (PUMP)

Adjusting Impeller Clearance

1.If it is necessary to replace impeller or volute, be sure clearance between impeller and volute is adjusted correctly.

2.The impeller should be as close to the volute as possible without rubbing against it. Clearance is adjusted by adding or removing shims from behind the impeller.

3.Check clearance between impeller and insert by slowly pulling starter rope to turn impeller. Remove spark plug to make it easier to turn impeller.

It is important not to remove too many shims or the clearance

NOTE between the impeller and volute will become too wide and pump performance will be reduced. Remember as the impeller wear

down, additional shims may be required to maintain the clearance between the impeller and insert.

4.Check the impeller every six months for wear, and for clearance between the impeller face and the volute. Also check the shaft seal for wear, as well as the shaft sleeve.

Pump Cleaning

After pumping water containing large amounts of dirt and debris, perform the following:

1.Remove the drain plug from the pump housing (Figure 2) and drain any water left in the pump.

2.Loosen the two locking hand knobs (turn counterclockwise) and remove clean-out cover.

3.Clean and remove dirt, debris from pump casing. Inspect impeller and volute for wear.Replace any damaged or worn parts.

CAUTION

The impeller may develop sharp edges. Use extreme care when cleaning around the impeller to prevent being cut.

PAGE 22 — QP- 2TE TRASH PUMP — OPERATION AND PARTS MANUAL — REV. #1 (08/10/10)

Image 22
Contents Model QP-2TE Proposition 65WARNING Page QP- 2TE Table of Contents Parts Ordering Procedures Ordering parts has never been easierSafety Information Safety MessagesGeneral Safety Engine Safety Fuel Safety Transporting Safety Page QP- 2TE SPECIFICATIONS/DIMENSIONS Pump Specifications PumpSpecifications Engine QP- 2TE General Information ApplicationQP- 2TE Pump Components WaterQP- 2TE Refueling Plastic TRUCK-BED LinerQP- 2TE Basic Engine Initial ServicingQP- 2TE PRE-INSPECTION Engine Before StartingQP- 2TE PRE-SETUP Pump Read safety instructions at the beginning of manualQP- 2TE Initial START-UP Engine Starting the Engine Robin engineQP- 2TE Initial START-UP Engine QP- 2TE Maintenance Pump Pump Vacuum TestQP- 2TE Maintenance Pump QP- 2TE Maintenance Engine Engine Maintenance ScheduleQP- 2TE Maintenance Engine QP- 2TE Preparation for Long -TERM Storage Pump StoragePage QP- 2TE Troubleshooting Engine Engine TroubleshootingQP- 2TE Troubleshooting ENGINE/PUMP QP- 2TE Explanation of Code in Remarks Column QP- 2TE Suggested Spare Parts QP- 2TETRASH Pump 1TO 3 Units Robin EX170D50021 EngineQP- 2TE Pump Assy Part Name QTY Remarks QP- 2TE Pump Assy QP 2TE Pump Assy Bolt SET with Spring Washer Suction COVERM8 XRobin EX170D50021 ENGINE- Crankcase Assy Part Name QTY Remarks Robin EX170D50021 ENGINE- Crankshaft and Piston Assy Robin EX170D50021 ENGINE- Crankshaft and Piston Assy Robin EX170D50021 ENGINE- Governor Assy Part Name QTY. Remarks Robin EX170D50021 ENGINE- Intake Exhaust Assy PIN, CAM Shaft Robin EX170D50021 Engine AIR Cleaner Assy Base CP Robin EX170D50021 Engine Cooling and Starting Assy Robin EX170D50021 ENGINE- Cooling and Starting Assy Robin EX170D50021 Engine Carburetor Assy Throttle Valve Robin EX170D50021 Engine Flywheel Assy Part Name QTY Robin EX170D50021 ENGINE- Electric Device Assy OIL Sensor CP Robin EX170D50021 ENGINE- Fueltank Assy Fuel Tank CP Terms and Conditions of Sale Parts Freight PolicyPage HERE’S HOW to GET Help

Qp-2TE specifications

The Multiquip QP-2TE is a highly regarded option in the realm of portable generators, designed to meet the demands of both commercial and residential applications. Renowned for its reliability and performance, the QP-2TE delivers exceptional power in a compact and user-friendly package.

At the heart of the Multiquip QP-2TE is a durable, high-performance engine that provides 2,000 watts of surge power and 1,600 watts of continuous power. This robust power output is more than sufficient for running essential equipment such as power tools, lighting, and even small appliances. The generator comes equipped with an easy-to-read fuel gauge, allowing users to monitor fuel levels at a glance, ensuring they can operate without interruptions.

The QP-2TE features a versatile power panel with multiple outlets. It includes both 120V and 12V DC outlets, enabling users to connect various devices simultaneously. The inclusion of a 120V, 20A duplex outlet adds to the generator's versatility, allowing it to power multiple tools at once or provide temporary power to an entire campsite. The generator's lightweight construction, weighing only around 45 pounds, ensures portability, making it suitable for outdoor events, job sites, or emergency backup power.

Technologically speaking, the QP-2TE integrates advanced features such as low oil shutdown and circuit protection. These safety mechanisms are crucial as they prevent damage to the engine and connected devices during operation, ensuring longevity and reliability. Its efficient cooling system also aids in preventing overheating, allowing the generator to function optimally for extended periods.

Another standout characteristic of the Multiquip QP-2TE is its whisper-quiet operation. Designed with noise reduction features, it operates at a remarkably low decibel level, making it ideal for use in residential neighborhoods or campgrounds where noise restrictions might be in place. Its fuel-efficient operation enhances its appeal, allowing users to maximize run time on a single tank of gas.

In summary, the Multiquip QP-2TE is a powerful, portable generator that combines rugged durability with advanced safety features and quiet operation. Its versatility, lightweight design, and efficient power output make it an excellent choice for those seeking reliable energy solutions in various settings. Whether for emergency power, outdoor activities, or job site operations, the QP-2TE stands out as a premium option in the portable generator market.