Samsung AW09L2, AW07L2 user manual Setting UP the AIR Conditiner, Assembly for drainage

Page 17

installing your air conditioner

SETTING UP THE AIR CONDITINER

The air conditioner must be installed horizontally or tilted slightly to the outside for proper water drainage.

Assembly for drainage

Once a location has been selected for installation, proper drainage should be established. If the drain tube and/or drain hose are not provided, call your nearest contact center.

1.Attach the gasket 1 and the drain tube 2 to the base pan hole 3 in the rear side of the unit with screws 4

 

4

1

REAR SIDE

 

3

2

2.Connect the Rubber Cap 5 to the drain tube hole.

5

On exceptionally hot and humid days the air conditioner may overflow condensed water. In hot and high humidity zones, make sure the Rubber Cap have been removed .

installing _17

Image 17
Contents Air Conditioner Timer Function Easy MaintenanceCool Summer Offer Look for EverywhereSevere Warning Signs Safety informationSafety Information Use an exclusive power source for the air conditioner Ensure no water gets into the air conditioner Safety information Contents Checking the Parts and the Control Panel Setting up your air conditioner before useControl Panel Ventilation leverCooling Operating your air conditionerAir circulation Air Conditioner Off TimerVertical air flow Adjusting the AIR Flow DirectionHorizontal air flow Cleaning the Exterior Cleaning and maintaining your air conditionerCleaning the AIR Filter Maintaining the AIR ConditionerOperation Ranges TroubleshootingAppendix Getting Ready to Install the AIR Conditioner Installing your air conditionerChecking included parts Selecting the best locationAssembly for drainage Setting UP the AIR ConditinerQuestions or COMMENTS?