5Connect the O1 and O2 terminals of the centralized controller to the O1 and O2 terminals on the electrical component box as shown in figure.
CAUTION
◆Do NOT keep the centralized controller cables with a 220V cable because the centralized controller cables have low voltage.
Note Cable Specifications
Cable type |
| |
2G(Shield Cable) | ||
| ||
Size of cables | 0.75mm2~1.25mm2 | |
|
| |
Max. length of electric wires from the | 1000m(1094 yd) | |
indoor unit to the centralized controller | ||
| ||
|
|
6Connect the power cables.
Note Cable Specifications
Cable type | Power Supply | ||
2G | |||
|
| ||
Size of cables | 0.75mm2~1.25mm2 | ||
|
|
|
7Reassemble the centralized controller.
CAUTION
◆The optional kits must be installed by an installation specialist.
◆Before installing the optional kits, ensure that you have turned off the main power.
◆All optional kits cables should be installed according to the national wiring rules and you must install them in the wall not to be touched by users.