3.0 INSTALLATION
To install the Pelco Infrared VCR Controller, proceed as follows:
1.Set the baud.
2.Set the start address.
3.Connect the
4.Connect additional IRC units in
5.Connect VCRs to the Video Matrix Bay
6.Connect the IR control cables to the VCRs.
Each step listed above is detailed below:
3.1 COMMUNICATION CARD
The communication card (refer to Figure 4) has a bank of eight DIP switches used to do the following:
1.Set the operating baud of the unit
2.Set the start address
In Figure 5, DIP switch number 2 is ON.
COMMUNICATION CARD |
Figure 4. Communication Card
Figure 5. DIP Switches
Pelco Manual C544M (2/98) | 7 |