6.Suspended Ceiling Only: Install the ceiling tile with the back box. Attach a T-rail clip on each side of the ceiling tile.

WARNING: An electrical short in the back box may occur if the metal BNC connector is not completely covered by the protective boot.

7.Connect wiring to the circuit board inside the back box. When finished, close the door to the back box and turn on the power. The green LED will light.

NOTES:

Aux 1: Maximum 2 A at low voltage (<40 V)

Aux 2: Maximum 30 mA at 32 VDC

If you are using both unshielded twisted pair (UTP) wiring and a translator board, install the UTP wiring before installing the translator board.

If you are installing an environmental back box in a railway application, attach a ground wire from the circuit board power connector to a structural ground using at least 18-gauge wire.

C3417M-B (11/06)

5

Image 5
Contents Spectra IV Series Spectra IV SE Series Installation Table C. UTP Wiring Distances Wire Gauge Total VAC3417M-B 11/06 C3417M-B 11/06 Switch 1 Dome Drive Table D. Spectra Dome Drive and Back Box CompatibilityCheck the signal with a volt meter or an oscilloscope TroubleshootingSwitch Settings Table G. Switch Settings for SW1, D-Type Control Table F. Switch Settings for SW1, P-Type Control100 111 191 In-Ceiling SpecificationsEnvironmental In-Ceiling Product Warranty and Return Information ISO9001