DRAIN INSTALLATION
SPRAY INSTALLATION
Assemble
Thread LOCKNUT (6), WASHER (7) and GASKET (8) onto DRAIN BODY (5).
Apply a bead of PUTTY to underside of FLANGE (9).
Feed DRAIN BODY (5) up through BIDET and thread FLANGE (9) fully onto BODY (5).
Tighten LOCKNUT (6) firmly, keeping the PIVOT ROD (3) pointed towards the back of the BIDET.
Push DRAIN ESCUTCHEON (10) onto TAILPIECE (11).
STOPPER
9
PUTTY
Assemble SPRAY BODY (1) to BIDET. Using putty, seal underside of SPRAY BODY FLANGE (2) and secure with NUT (3).
Screw SPRAY HOSE (4) with SEAL WASHER (5) to SPRAY BODY (1). Connect other end of HOSE (4) with SEAL WASHER (6) to side outlet NIPPLE (7) of the TRANSFER VALVE (8).
Screw SPRAY CAP (9) onto SPRAY BODY (1).
8 | BIDET |
CLIP |
7 | 4 | |
2 | ||
|
8 |
|
|
7 | 2 | 9 |
|
| |
| PUTTY | 1 |
6 |
|
|
6
3
3 |
1
5
11
10
5 |
4 |
TEE AND HOSE CONNECTION
Insert SEAL (1) into ADAPTER (2) and tighten ADAPTER (2) to bottom of TRANSFER VALVE (3).
Install SEAL (4) into coupling nut of TEE (5) and tighten connection to ADAPTER (2)
Cold
3
1
Connect HOSE COUPLING NUTS (6) to Hot and Cold valve bodies and securely tighten.
2
4
COUPLING
NUT
6
Hot 6
5
LIFT ROD GUIDE INSTALLATION
Unscrew LIFT ROD NUT (1) from LIFT ROD GUIDE (2).
Front
2
Make sure SEAL (3) is seated into ESCUTCHEON of LIFT ROD GUIDE (2).
3
Drop LIFT ROD GUIDE (2) into rear hole of bidet and from below secure with ROD GUIDE NUT (1).
1
. 3 & 7