5.4 Technical specifications

 

 

 

 

 

E-Series

 

 

 

 

 

Natural gas

 

Propane gas

Boiler type

 

E75CN

E110CN

 

E75CP

E110CP

 

 

 

 

 

 

 

 

 

Input Hs CH

BTU/hr

75,000

110,000

 

75,000

110,000

 

 

 

kW

22

32

 

22

32

 

 

 

 

Propane orifice diameter

inch / mm

n.a.

n.a.

 

0.16" / 4.15

0.20" / 5.2

Display indication at start-up

 

22.t

32.t

 

22.tP

32.tP

Qn

Output non-condensing CH

BTU/hr

67,500

98,000

 

67,500

98,000

 

 

 

kW

19.8

28.8

 

19.8

28.8

Qn

Output EN677 efficiency CH

BTU/hr

74,100

108,000

 

74,100

108,000

 

 

 

kW

21.7

31.7

 

21.7

31.7

Qn

Output AFUE CH

BTU/hr

72,400

105,700

 

72,400

105,700

 

 

 

kW

21.2

30.7

 

21.2

30.7

Efficiency at 98.6/86°F (36/30°C) part load,

%

98.8

99.0

 

98.8

99.0

Hs, EN677 CH

 

 

 

 

 

 

AFUE according IBR

%

96.5

96.1

 

96.5

96.1

O2 (at full load)

%

4.4 - 4.7

4.8 - 5.1

Electr. power consumption max.

W

 

 

145

 

Electr. power consumption stand by

W

 

 

14

 

Current

V/Hz

 

120Vac/60Hz

 

Fuse rating

A

 

5AF & 4AT

 

Degree of protection acc. EN 60529

 

 

IPX4D (IPX0D in case of room air)

 

Weight (empty)

lbs / kg

91 / 39

101 / 40

 

91 / 39

101 / 40

Water content CH

 

gallon / liter

0.9 / 3.5

1.3 / 5

 

0.9 / 3.5

1.3 / 5

Water content DHW

 

gallon / liter

0.13 / 0.5

0.18 / 0.7

 

0.13 / 0.5

0.18 / 0.7

After run time pump CH

min

 

 

5

 

After run time pump DHW

min

 

 

1

 

PMS Water pressure min.-max.

PSI / bar

 

14-43 / 1-3

 

PMW Water pressure DHW max.

PSI / bar

 

150 / 10

 

Flow temperature max.

°F / °C

 

176 / 80

 

Pump type

 

UPS20-48

UPS20-58

 

UPS20-48

UPS20-58

Available pump height CH

PSI / kPa

3.8 / 26

0.7 / 5

 

3.8 / 26

0.7 / 5

Approvals

 

 

ASME,

CSA

 

DHW flow (at 50°F)

gallon/min

 

4.6

 

 

4.6

DHW flow (at 10°C)

liter/min

 

17.4

 

 

17.4

DHW flow (at 75°F)

gallon/min

2.1

3.2

 

2.1

3.2

DHW flow (at 23.9°C)

liter/min

7.9

12.1

 

7.9

12.1

 

DHW temperature (T in=50°F (10°C)

°F / °C

 

176 / 80

 

Pressure difference DHW

PSI / bar

2.9 / 0.2

4.4

 

2.9 / 0.2

4.4

Content expansion vessel

gallon / liter

2.1 / 8

3.1 / 12

 

2.1 / 8

3.1 / 12

Pre-charge pressure expansion vessel

PSI / bar

 

14.5

/ 1

 

 

 

 

 

 

 

 

 

 

CSA number

 

 

2183087

 

 

Technical specifications

 

 

 

 

Table 4

 

16

Image 16
Contents Instructions Subject to technical changes Contents of instructionsUpdating of documentation Content Safety and general instructions Symbol definitionsDesignated use Hazard definitionsFollowing instructions must be followed What to do if YOU Smell GASTools, materials and additional equipment Follow these instructions for the space heating waterDisposal Regulations and guidelines Description of the boiler Room sealed boilerCondensing ModulatingScope of delivery Packaging and transportationTransportation Installation Requirements for the installation roomFitting the boiler Dimensions E75CPConnection for combustion air supply and vent system Plumbing Kits Plumbing KitClearances from boiler Low Loss HeaderTechnical specifications CSAConnecting the boiler Central heating systemPlumbing Kit installation Compression fittingsInstallation & Servicing Instructions Rinnai E Safety valve Low water cut offExpansion tank With the boilerUnderfloor heating system plastic pipes Gas supply connectionGas connection with natural gas Gas pipingGas connection with propane gas Propane Supply Pressure RequirementsHot water supply Condensate drain pipeVent system and air supply system Intake / Exhaust GuidelinesTo the boiler. See the list on Agency2a Examples vent and air supply systems concentric 2b Examples vent and air supply systems parallel Installation of the vent system Concentric system seeParallel system see Room Air System outdoor combustion airRecommended vent/air intake terminal position Terminal positionsOccur to building products in the vicinity see Item Description Flue Material United StatesDimensioning of the exhaust and air intake duct Combustion air and vent piping lengths Calculation of equivalent length vent systemParallel system Total equivalent length Concentric systemCalculation of compensation factor Boiler type E75 E110Room Air System indoor combustion air Unconfined SpaceLouvers and Grills Confined SpaceLocation Using Indoor Air For Combustion Using Outdoor Air For CombustionConnecting incoming power Electrical connectionsAre used must have a Volt free contact Connection terminal E-SeriesElectrical diagram Electrical ladder diagram Boiler controls Good-state or standard read outTechnical read out Operation indicationExplanation of the function buttons Requirements of the water system Filling the heating system Freeze protectionWith water will have to be done Do not try to light the burner by hand Close main gas shut off valveAdjustments Altering adjustmentsPress the Mode-button for 5 seconds Press the STORE-button to confirm the code code blinks1Parameter Mode Outdoor reset Boiler and/or the installation Activating factory settings green button functionIsolating the boiler Commissioning Testing the Ignition Safety shut off device Testing for gas leaksStart up of the boiler Type of boiler Checking for contaminationBoiler needs maintanance Follow the next procedure Checking of the zero pressure controlChecking the O2 Installing the casing Measuring the ionization currentMaintenance Periodic examination of venting systems and boilerInspection TechnicianChecking and adjusting the gas/air ratio Visual inspection for general signs of corrosionMeasuring the inlet gas pressure Carrying out a pressure test of the heating systemMaintenance activities Replace the gasket with a new oneCondensate trap Condensate trayWarranty Visual inspection of the flameParts of the boiler G KBlocks and Errors Error indication short referenceBlocks External safety contact is activeBlock Check flow through the installation Execute Parameter-Reset Check flow through the boiler and DHW fascilityCheck the sensors NTC 1 and NTC Check the main Power supply Check the boiler PumpError ErrorsRectify the short-circuit If necessary replace this part Check the 24 Volt Connection Disconnect voltage from the boiler and check the fuse F2Check Disconnected Components for short-circuiting Ionisation flow Ionisation cable or O2 setting Check the data in Error modeGas Reset the boiler Software error con Trol unitRectify the prece Ding error Error persists After reset Software error Control unit Software error Control unit Error Check the 24 Volt Connections Remove Voltage from the boiler and check fuse F2Check Disconnected parts for wear and tear Software error Control unit Temperature of 36 is displayed at position If necessary Replace the flow SensorCheck actual flow temperature Check flow sensor NTC1Check actual return temperature Check return Sensor NTCFuse is working and the error is repeated Wiring and voltage are OK and error is repeatedFan is not Spinning If necessary Replace the fanWiring is OK but the error is repeated Check the wiringReplace Sensor Shut down of return sensor T2 Contact for supply sensor T1 open Check the data Error mode Software error Control unit Other errors Central heating but no hot waterKey of the central heating program is not switched on Hot water but no central heatingRS100 with outdoor Sensor Room sensor-On Three-port valve is not circulating to central heatingKey pump program Is on Insufficient quantity of hot water Hot and cold water Connection to the boiler Mixed upIncorrect flow reducing Valve Absence Positive resultsDHW power for the boiler is set too low Temperature drop of the DHWFlow reducing valve Incorrect choice Installation Radiators do not get hot enough or warming up takes too longSpare parts Parts casing E-SeriesInstallation Manual E-SERIES DescriptionParts heat exchanger E-Series OSS1 OSS2 Clamp BAR TOP Part H.EX. Long Parts rear wall E-Series OSS1 OSS2 Parts pipes E-Series Description Parts electrical components E-Series 166 167101 Parts list vent system Vent ProductsHeatfab Rinnai/ UbbinkCommon venting guidelines 103104 105 106 107 800000012 9/2009

E75CP, E110CN, E75CN, E110CP specifications

Rinnai is a leading name in the heating industry, recognized for producing highly efficient and reliable tankless water heaters. Among their popular models are the Rinnai E75CN, E75CP, E110CP, and E110CN, each designed to cater to various household needs and preferences.

The Rinnai E75CN and E75CP are both remarkable for their compact size and impressive heating capabilities. The E75CN is a natural gas model, while the E75CP runs on propane. These units are designed to deliver a maximum flow rate of up to 7.5 gallons per minute, ensuring that multiple fixtures can be used simultaneously without a dip in performance.

Both models incorporate advanced temperature control technology, allowing users to set their desired water temperature with precision. The units feature a durable heat exchanger, constructed from high-grade stainless steel, which not only promotes longevity but also helps in preventing corrosion. Additionally, they come with built-in safety features, such as freeze protection and an overheat cut-off system, ensuring safe operation in varying conditions.

Moving on to the Rinnai E110CP and E110CN, these tankless water heaters are designed for larger households with higher hot water demands. The E110CP operates on propane, while the E110CN utilizes natural gas. These units deliver a maximum flow rate of up to 11 gallons per minute, making them ideal for simultaneous use in multiple bathrooms, kitchens, and laundry rooms.

The E110 models showcase Rinnai's Smart Technology, which optimizes energy consumption by adjusting the heating output based on the demand. This not only maximizes efficiency but also significantly reduces energy costs. They are equipped with digital controls and diagnostics, providing users with real-time information and the ability to troubleshoot easily if any issues arise.

In terms of installation, all four models are designed for versatility. They can be installed indoors or outdoors, giving homeowners flexibility based on their space and preference. With their compact design, these units require less space compared to traditional tank heaters, making them a suitable choice for modern homes.

Overall, Rinnai's E75CN, E75CP, E110PC, and E110CN models represent cutting-edge technology in tankless water heating. Their efficiency, safety features, and advanced technology make them an excellent choice for homeowners looking to upgrade their hot water systems. With Rinnai, users can enjoy the convenience of continuous hot water without sacrificing energy efficiency.