Premier Mounts SCM-103 installation instructions Installation Instructions

Page 11

SCM-103

THE SCM-103 IS HEAVY. IT IS STRONGLY RECOMMENDED THAT THREE PEOPLE PERFORM ALL INSTALLATION STEPS.

Step 6. Locate the ½”-20 Nuts & ½” flat washer.

Step 7. Measure 1 ¾” inches up the threaded stud attached to the cable and thread one ½-20 nut into position.

Leveling adjustment can be made at this stage by setting the nut position at different heights on the threaded post attached to the cable.

Step 8. Slide one ½” flat washer up to the nut and insert the end of the stud into the bottom hole of the mounting bracket. Step 9. Locate two ½”-20 nuts & one ½” flat washer.

Step 10. Tighten the two nuts until cable is locked tight into position.

Installation Instructions

Page 11

Image 11
Contents Installation Instructions Installation Instructions Recommended Installation Tools Parts ListLocate the Mounting Points Mounting the Brackets to the Display Securing Tubes to Mounting Brackets Securing the Lower CoverInstallation Instructions Lifting the Display into Position Cable Routing Installation Instructions Installation Instructions Installing the Beauty Covers Installation Instructions Technical Specifications What Premier Mounts Will Do WarrantyWhat is Not Covered Limitations What Customers Must Do for Limited Warranty Service