Securing Pipe to the PP-FCMA-QL
Step 1. Secure the 1½” (NPT) pipe to the ceiling plate and tighten by using one (1) M5 x 16 Phillips head screw (supplied) to the plate.
The M5 x 16 Phillip head screw must be used to stabilize the 1½” (NPT) pipe.
M5 x 16mm
Screw
Opening
Technical Specifications
All measurements are in inches (mm).
Installation Instructions | Page 11 |