Premier Mounts PP-FCMA-QL Ceiling Anchoring, Truss Concrete Wood, Truss ceiling, Wood Joist

Page 5

PP-FCMA-QL

Ceiling Anchoring

THE PP-FCMA-QL MUST SECURED USING THE SUPPLIED QUICK LOCKS AND BRAIDED CABLES.

Truss

Concrete

Wood

Truss

Concrete

Eye Lag Hole

Loop

Loop

Wood Joist

Eye Lag Hole

Braided Cable

Braided Cable

Truss ceiling

Step 1. Loop the braided cable around the truss.

Step 2. Run the open end through the loop.

Step 3. Pull the open end down until the braided cable tightens around the truss.

Concrete

Step 1. Determine the mounting location.

Step 2. Use a 1/4” masonry drill bit to pre-drill the mounting holes.

Step 3. Place the concrete anchor into the pre-drilled hole and gently tap into place using a rubber mallet or hammer.

Wood Joist

Step 1. Secure the four (4) ¼” eye lag screws to the wood joist in the ceiling.

Step 2. Make sure eye lag screws are properly secured to the joist before securing the wire to the cable locks on the plate.

Step 3. Run the open end through the hole in the eye lag screw.

Step 4. Run the open end through the loop.

Step 5. Pull the open end down until the braided cable tightens around the eye lag screw.

Installation Instructions

Page 5

Image 5
Contents Installation Instructions Installation Instructions Installation Tools Parts ListCeiling Tile Removal Truss Concrete Wood Ceiling AnchoringTruss ceiling Wood Joist24x48 Ceiling Tile PP-FCMA-QL Installation24x24 Ceiling Tile Step Attaching the Pipe ClampsAttaching the EMT Conduit Pipe Optional Quick Lock Installation EMT PP-FCMA-QL Adjustments Electrical Box InstallationTechnical Specifications Securing Pipe to the PP-FCMA-QLWhat is Not Covered Limitations WarrantyWhat Customers Must Do for Limited Warranty Service What Premier Mounts Will Do