Premier Mounts installation instructions Electrical Box Installation, PP-FCMA-QL Adjustments

Page 10

PP-FCMA-QL

Electrical Box Installation

Electrical installation should be done in accordance to local codes and regulations.

Step 1. Cut the tile where the electrical base box is going to be secured.

Step 2. Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure it to the plate.

Step 3. Make all electrical connections at this time.

Electrical Box

Electrical Box

Cut-out

PP-FCMA-QL Adjustments

Step 1. Loosen the M8 x 20mm screws and M8 flat washers. This will allow you to slide the base box laterally.

Please refer to the purchased base box for further operating instructions.

Ceiling Tile

PP-FCMA-QL

M8 Flat

Washer

M8 x 20mm

Phillips Head

Screw

Page 10

Installation Instructions

Image 10
Contents Installation Instructions Installation Instructions Parts List Installation ToolsCeiling Tile Removal Truss ceiling Ceiling AnchoringTruss Concrete Wood Wood Joist24x24 Ceiling Tile PP-FCMA-QL Installation24x48 Ceiling Tile Attaching the EMT Conduit Pipe Optional Attaching the Pipe ClampsStep Quick Lock Installation EMT Electrical Box Installation PP-FCMA-QL AdjustmentsSecuring Pipe to the PP-FCMA-QL Technical SpecificationsWhat Customers Must Do for Limited Warranty Service WarrantyWhat is Not Covered Limitations What Premier Mounts Will Do