PIPING DIAGRAM WITH UV-LIGHT
9 X
TO
ELECTRICAL
OUTLET
1
3
2
4
FROM THREE WAY |
|
VALVE TO | FROM WATERFALL |
WATERFALL | DRAIN TO BASIN |
A | B |
A FROM THREE WAY
VALVE TO WATERFALL
FROM BASIN TO
WATERFALL DRAIN
B
|
|
| FROM WATER |
|
|
| SOURCE TO |
INSTALLTHE SUPPLIED |
| FLOAT VALVE | |
|
| ||
HOSE CLAMPS ON EITHER |
|
| |
SIDE OF THE BASIN |
|
| |
|
|
| SADDLE VALVE |
|
| UV | FLOW CONTROL |
OVERFLOW | VALVE / PURGE | ||
PROTECTION | LIGHT SEDIMENT | VALVE | |
|
| FILTER |
|
TO DRAIN | PURGELINE |
|
|
|
|
|
Remove components from basin and assemble as shown. The fittings required are already attached to the filter and basin. |
|
When using the optional UV light, the barbed elbow fitting on the “IN” side of the filter will need to be removed and threaded into the |
|
elbow at the bottom of the UV light. Then connect the UV light directly to the sediment filter. Use teflon tape to seal these connec- |
|
tions. Ensure that the supplied ground wire is connected from the grounding terminal on the UV light to either grounded copper |
|
plumbing, or the ground in your electrical system. Use the supplied short piece of black tubing to run from the pump to the UV light. |
|
Measure and cut the lines to the length necessary, push onto the barbed fittings and secure with the supplied hose clamps. Leak | 11 |
test the waterfall before fully enclosing. |