Vulcan-Hart ML-136590, VST4B Operation, Controls, Lighting the GAS Pilot, Temporary Shutdown

Page 8

OPERATION

WARNING: THE BROILER AND ITS PARTS ARE HOT. USE CARE WHEN OPERATING, CLEANING, OR SERVICING THE BROILER.

CONTROLS

OFF ON

Access hole to pilot adjustment

Figure 9

All orifices are of the fixed type and require no adjustment.

Standing pilots should be adjusted via the pilot adjustment valve to provide a slight yellow tip on the flame. Pilots may be lighted by extending a taper to the pilot lighter tube up under the broiler area.

When broiling, turn burner control valves to 1/3 or 1/2 to prevent overheating.

Air shutters on the main burners must be individually adjusted to provide a blue flame.

All traces of yellow should be adjusted out of the burner flame. (See burner adjustment.)

When the grate is hot, scrape it with a wire brush to keep the grate clean. Do not allow debris to accumulate on the grate.

Turn flame to low setting during slack periods to conserve energy.

The broiler is a free vented appliance. All products of combustion and the heat generated by the burners pass through the grates. When meat is placed on the grates, this blocks the venting and causes a temperature buildup. The broiler operates most efficiently with valves turned down to 1/3 or 1/2.

LIGHTING THE GAS PILOT

1.Turn the individual burner gas valves off and wait 5 minutes

2.Turn the incoming main gas supply valve on. Light pilots through grate area by extending a taper to the pilot lighter tube up under the broiler area (Fig. 10).

3.To light the burners, turn the individual burner valves on.

Figure 10

TEMPORARY SHUTDOWN

Turn burner valves off.

COMPLETE SHUTDOWN

For complete shutdown, turn the main gas supply valve off. (Make sure all individual burner valves are off before relighting.)

— 8 —

Image 8
Contents Installation Chop House Broilers Important for Your Safety For Your SafetyTable of Contents Installation Installation Codes StandardsIntroduction GeneralRequired Tools LEG Stand Assembly InstructionsBroiler Stand Installation Burners & Ceramic Bricks Griddle Plate InstallationCASTER-EQUIPPED Broilers GAS Connection GAS Pressure Regulator InstallationVentilation Hood Operation ControlsLighting the GAS Pilot Temporary ShutdownGriddle AdjustmentsPreheating the Broiler Cleaning Broiler GrateGrease Chutes GriddleVent System MaintenanceService and Parts Information 35684 UNIS-ÉTATS AUX Imprimé Entretien VentilationInoxydable acier en Surfaces Frire à PlaqueNettoyage RéglagesFrire À Plaque Grilloir DU PréchauffageCommandes FonctionnementComplet Arrêt Temporaire ArrêtGAZ DE Pression DE Régulateur D’UN Installation GAZ DU Branchement Ventilation DE HotteCéramique EN Briques ET Brûleurs NivelageFig patte la de ’assemblage de extrémité petite la dans Pattes DE Support DU AssemblageRequis Outils Généralités Normes ET D’INSTALLATION CodesDéballage Matières DES Table Importantes Sécurité DE Mesures AvertissementSécurité DE Mesure GAZ AU Grilloirs