Chief Manufacturing JWD, JWP, JWS installation instructions Adjustments, Cable Management

Page 8

J-Series

 

Installation Instructions

 

 

ADJUSTMENTS

3

x 2

Swing Arm

 

 

PIVOT / SWING TENSION

 

 

1. Slightly loosen or tighten the adjustment screw(s) as

 

 

necessary (See Figure 8).

 

 

1

Figure 6

4.Tighten all hardware.

Figure 8

CABLE MANAGEMENT

1.Attach all cables to display.

CAUTION: Ensure that adequate cable slack exists for movement of display, and that cables will not be pinched by installation of cable management cover(s) (E) or screws (G).

2.Carefully insert cables in cavity located in lower portion of mount arm (See Figure 7).

DISPLAY ROLL / PITCH / YAW TENSION:

1.Disconnect all wires and cable from the display.

2.Remove two Lower screws securing display to Centris cup.

3.Loosen two Upper screws securing display.

4.Lift display upward and away from mount.

5.Turn the tension adjustment screw clockwise to increase tension, or counter-clockwise to decrease tension.

(See Figure 9)

3.Install cover (E) with two 8-32 x 3/8" Phillips screws (G). (See Figure 7)

2

 

Cable Path

 

(E) x 1 (JWS)

(typical)

 

 

 

(E) x 2 (JWD)

 

 

3

(G) x 2 (JWS)

 

(G) x 4 (JWD)

 

 

Figure 7

5

Figure 9

Re-install display.

8

Image 8
Contents Series Important Warnings and Cautions Dimensions JWP DisclaimerJWS JWDBy Hand Optional Tools Required for Installation Parts PartsInstallation Display Installation Damage Parts and Lead to Serious PersonalAdjustments Cable ManagementInstallation Instructions Series +31 040