Installation Instructions |
ASSEMBLY AND INSTALLATION
Installation of Protective Rubber Edging
1.Place four strips of protective rubber edging (C) over the sharp edges located on the top and bottom of the mount (A). (See Figure 1)
(A) |
1 |
(C) x 4 |
Figure 1
CPU Installation
1.Release bracket from mount by moving the flag to the open position. (See Figure 2)
2.Remove bracket from mounting buttons on back of mount. (See Figure 2)
2 |
1 |
Figure 2
3.If hanging mount underneath desk, remove mounting
buttons to reinstall them in the holes in which they will be used.
•If mounting vertically, move mounting buttons in the four holes on top of the mount. (See Figure 3)
•If mounting horizontally, move mounting buttons in the top four holes on the back. (See Figure 3)
Vertical button location | Horizontal button location |
Figure 3
4.Loosen adjustment knob at the back of the mounting unit and adjust height of mount to a height greater than the height of the CPU to be installed. Loosen strap at the front of the mount if necessary. (See Figure 4)
4 |
Figure 4
5.Loosen adjustment knobs on top and bottom of the mount and slide flanges in order to allow for the CPU to be inserted for mounting. (See Figure 5)
NOTE: Top and bottom knobs can be removed and inserted into the front square holes in order to allow for large
5