INFRARED NATURAL GAS HEATER
INSTALLATION
Continued
CONNECTING TO GAS SUPPLY
WARNING: This appliance re- quires a 3/8" NPT (National Pipe Thread) inlet connection to the pressure regulator.
WARNING: A qualified service person must connect heater to gas supply. Follow all local codes.
WARNING: Never connect heater to private
IMPORTANT: Install an equipment shutoff valve in an accessible location. The equip- ment shutoff valve is for turning on or shutting off the gas to the appliance.
Apply pipe joint sealant lightly to male threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged heater valves.
CAUTION: Use pipe joint seal- ant that is resistant to liquid pe- troleum (LP) gas.
Install sediment trap in supply line as shown in Figure 12. Locate sediment trap where it is within reach for cleaning. Locate sedi- ment trap where trapped matter is not likely to freeze. A sediment trap traps moisture and contaminants. This keeps them from going into heater controls. If sediment trap is not installed or is installed wrong, heater may not run properly.
IMPORTANT: Hold pressure regulator with wrench when connecting it to gas pip- ing and/or fittings.
IMPORTANT: Check gas line pressure be- fore connecting heater to gas line. Gas line pressure must be no greater than 14 inches of water. If gas line pressure is higher, heater regulator damage could occur.
CAUTION: Use only new, black iron or steel pipe. Inter-
Pressure Regulator
3/8" NPT
Pipe Nipple
Heater
Cabinet
Ground Joint
Union
be used in certain areas. Check your local codes. Use pipe of large enough diameter to allow proper gas volume to heater. If pipe is too small, undue loss of pres- sure will occur.
Typical Inlet Pipe Diameters
VN1800TB | 3/8" or greater |
VN3000TB | 1/2" or greater |
Installation must include an equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test
Test
Gauge
Connection *
Sediment
Trap
Tee Joint
Reducer Bushing to 1/8" NPT
1/8" NPT Plug Tap
Tee Joint
Pipe Nipple
Cap
Equipment Shutoff Valve *
Inlet Pipe From Gas Meter (7" W.C. to 10.5" W.C. Pressure)
3" Minimum
gauge hook up. NPT tap must be upstream from heater (see Figure 12).
Figure 12 - Gas Connection
*A CSA/AGA
10 | 104820 |