Hubbell Electric Heater Company E manual Immersion Temperature High Limit CUT-OFF

Page 14

IMMERSION TEMPERATURE HIGH LIMIT CUT-OFF

1.Disconnect power from unit.

2.Remove access cover.

3.Remove high limit cover screw and cover.

Cover

Cover Screw

Reset Switch

4. Disconnect the two (2) 14 gauge wires.

Wires

Capillary Tube

5. Remove capillary tube and bulb from thermowell

6. Remove two (2) mounting screws.

Mounting Screws

7.Remove control and install new high limit switch by performing above steps in reverse order. (Note: Be sure to place capillary tube into slot in base prior to installing cover.)

14

Image 14
Contents Electric Heater Company Hubbell Electric Heater Company STRATFORD, CTTable of Contents Section Title Page Tank Connections Section I General Description and ConstructionTank Heating ElementTemperature High Limit Switch Control ThermostatOuter Shell and Insulation OptionsWater Heater Placement Piping InstallationFinal Checks Electrical InstallationFilling the Heater Freezing Section III Scheduled Maintenance and OperationMaintenance and Operation Quarterly InspectionAnnual Inspection Section IV Troubleshooting Symptom Probable Cause Corrective Action / RemedySection V Servicing & Replacement of Parts Surface Temperature High Limit CUT-OFFImmersion Temperature High Limit CUT-OFF Heating Element Page Page Surface Mounted Thermostat Immersion Thermostat Relief Valve Section VI Miscellaneous Charts and Formulas Element Chart Formulas Torque Values