Carrier 58MEC instruction manual Tube Routing

Page 9

 

TUBE ROUTING

 

Furnace is shipped from factory in upflow configuration. Pressure tube and drain tube routing MUST match the diagrams below.

Condensate Trap; Factory Installed

Tube location when used in UPFLOW application

Condensate Trap on LEFT

in Blower Shelf

 

 

Side Optional

(Blower access panel removed)

BURNER ENCLOSURE

 

BURNER ENCLOSURE

PRESSURE REFERENCE

 

 

 

PRESSURE REFERENCE

 

TUBE ASSEMBLY

 

 

 

TUBE ASSEMBLY

COLLECTOR BOX TUBE

CAP

 

CAP

(PINK)

PLUG

 

PLUG

 

COLLECTOR BOX TUBE

COLLECTOR BOX TUBE

 

 

 

COLLECTOR BOX DRAIN

(PINK)

 

(GREEN)

 

 

 

 

TUBE

COLLECTOR BOX TUBE (GREEN)

 

INDUCER HOUSING (MOLDED) DRAIN TUBE

(BLUE & WHITE STRIPED)

COLLECTOR BOX DRAIN TUBE

 

 

(BLUE & WHITE STRIPED)

(BEHIND COLLECTOR BOX DRAIN TUBE)

 

 

 

 

 

 

CONDENSATE TRAP

COLLECTOR BOX DRAIN TUBE

 

COLLECTOR BOX DRAIN TUBE

 

(BLUE)

 

(BLUE)

 

 

 

 

FIELD-INSTALLED

 

 

 

FACTORY- SUPPLIED

CONDENSATE TRAP

 

 

DRAIN TUBE COUPLING

 

FIELD-INSTALLED

 

 

(RIGHT DRAIN OPTION)

 

INDUCER HOUSING DRAIN TUBE

FACTORY-SUPPLIED DRAIN TUBE

 

 

 

 

(VIOLET)

COUPLING (LEFT DRAIN OPTION)

FIELD-INSTALLED

 

 

 

 

FACTORY-SUPPLIED 1/2-IN.

 

 

FIELD-INSTALLED FACTORY-SUPPLIED

CPVC STREET ELBOWS (2)

 

 

FOR LEFT DRAIN OPTION

 

 

DRAIN TUBE

 

 

 

 

 

 

Condensate Trap on

 

Tube location when used in DOWNFLOW application

 

 

LEFT Side

 

T

 

 

 

 

 

 

 

 

 

COLLECTOR BOX

 

PLUG

CAP

 

 

 

DRAIN TUBE (BLUE)

 

 

CAP

 

PLUGGED END

 

 

COLLECTOR BOX DRAIN TUBE

 

 

 

 

 

 

COLLECTOR BOX DRAIN

 

(BLUE)

COLLECTOR BOX

 

TUBE

 

 

TUBE (GREEN)

 

(BLUE & WHITE STRIPED)

 

COLLECTOR BOX TUBE

 

 

 

(PINK)

 

 

 

 

COLLECTOR BOX DRAIN TUBE

PLUG

 

 

COLLECTOR BOX TUBE

(BLUE & WHITE STRIPED)

 

INDUCER HOUSING DRAIN

 

 

 

 

(GREEN)

COLLECTOR BOX

 

TUBE (VIOLET)

COLLECTOR BOX EXTENSION TUBE

EXTENSION TUBE

 

 

 

COLLECTOR BOX

 

 

BURNER ENCLOSURE PRESSU

 

 

 

REFERENCE TUBE ASSEMBL

CONDENSATE TRAP

EXTENSION TUBE

 

 

DRAIN TUBE COUPLING

 

CONDENSATE TRAP

 

COLLECTOR BOX

 

BURNER ENCLOSURE PRESSURE

 

 

 

TUBE (PINK)

DRAIN TUBES ROUTED IN

 

COLLECTOR BOX

REFERENCE TUBE ASSEMBLY

 

INDUCER HOUSING DRAIN TUBE (VIOLET)

 

FRONT OF GAS VALVE

GAS VALVE

EXTENSION DRAIN TUBE

 

 

 

 

Tube location when used on

 

Tube location when used on

 

 

HORIZONTAL - LEFT application

 

HORIZONTAL - RIGHT application

 

 

 

 

 

 

AUXILIARY "J" BOX

COLLECTOR BOX DRAIN TUBE

COLLECTOR BOX DRAIN TUBE

COLLECTOR BOX EXTENSION TUBE

 

(BLUE & WHITE STRIPED)

(BLUE)

COLLECTOR BOX TUBE (PINK)

PLUG

 

 

 

CAP

COLLECTOR BOX

PLUG

AUXILIARY "J" BOX RELOCATED HERE

BURNER ENCLOSURE

TUBE (GREEN)

 

 

 

 

 

PRESSURE REFERENCE

 

 

 

TUBE ASSEMBLY

 

 

 

COLLECTOR BOX

 

INDUCER HOUSING

CAP

 

 

 

DRAIN TUBE

 

BURNER ENCLOSURE

EXTENSION TUBE

 

 

 

 

(VIOLET)

 

 

PRESSURE REFERENCE

 

 

 

 

 

 

COLLECTOR BOX

 

 

TUBE ASSEMBLY

CONDENSATE TRAP

 

 

 

 

 

DRAIN TUBE (BLUE)

COLLECTOR BOX

 

COLLECTOR BOX

COLLECTOR BOX EXTENSION DRAIN TUBE

DRAIN TUBE

COLLECTOR BOX TUBE (PINK)

TUBE (GREEN)

 

EXTENSION TUBE

COUPLING

RELOCATE TUBE BETWEEN BLOWER

COLLECTOR BOX DRAIN TUBE

CONDENSATE TRAP

 

 

SHELF AND INDUCER HOUSING FOR

 

 

(BLUE AND WHITE STRIPED)

 

 

 

 

060 AND 080 HEATING INPUT

INDUCER HOUSING DRAIN TUBE (VIOLET)

NOTE:

 

FURNACES

 

 

 

 

 

 

 

 

 

 

1. All tubing must be connected securely and routed to avoid kinks and traps.

 

 

326476-201 REV. B

2. Pressure tubing must always slope away from pressure switch to collector box connection as shown.

 

3. HORIZONTAL-LEFT installations require the collector box pressure tube to be relocated between the inducer housing and the blower shelf to

(lit-bottom)

prevent a trap. Refer to the Installation Instructions for further details.

 

 

 

 

 

A01052

Fig. 10 --Furnace Pressure and Draining Tube Diagram

58MEC

9

Image 9
Contents Safety Considerations Table of ContentsElectrostatic Discharge ESD Precautions GeneralUnit Damage Hazard Care and Maintenance Cleaning and/or Replacing Air FilterBlower Motor and Wheel Maintenance Bottom Filter Arrangement Electrical Shock Hazard Cleaning BurnersFIRE, EXPLOSION, Unit Damage Hazard Unit Component Electrical Short HazardUnit MAY not Operate Cleaning Heat ExchangersFlushing Collector Box and Drainage System Combustion-Air Intake Housing Gasket RepairTube Routing Burn Hazard Servicing Hot Surface IgniterChecking Heat Tape Operation If Applicable Electrical Controls and WiringWinterizing Unit and Property Damage HazardField Wiring Wiring Diagram TroubleshootingStatus Codes Electrical Shock and Unit Operation Hazard Component TestService Wiring Diagram Troubleshooting Guide TWO-STAGE Catalog No 58MEC---01SM