Empire Comfort Systems DV-35-2SG Optional Blower Installation Instructions, Optional Blower DRB-1

Page 16

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

OPTIONAL BLOWER DRB-1

Vented Room Heaters RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6) Direct Vent Wall Furnaces DV-25-(1, 2)SG and DV-35-(1, 2)SG

Installing Optional DRB-1 Blower

1.For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), remove casing front.

1.For DV-25-(1, 2)SG and DV-35-(1, 2)SG, remove casing front and heat shield.

2.When facing appliance, insert blower assembly into the left section of the casing (adjacent to the combustion chamber).

3.For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), route cord set through opening in casing back. The opening in casing back is located adjacent to gas control.

3.For DV-25-(1, 2)SG and DV-35-(1, 2)SG, route cord set through opening in casing bottom. The opening in casing bottom is located beneath gas control.

4.Align the (2) screw holes on the inner side panel and the (2) screw holes on casing back with the (4) clearance holes on the blower assembly. Attach blower assembly to the casing back and inner side panel with (4) #10 x 1/2" (13mm) screws provided. The blower assembly must be attached first to the casing back and then to the casing side panel.

5.For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), replace casing front.

5.For DV-25-(1, 2)SG and DV-35-(1, 2)SG, replace heat shield and casing front.

Attention: Wiring harness on blower is factory assembled and installed. If wiring harness becomes disassembled use the following steps to reassemble the wiring harness.

1.Attach (1) pin terminal from black (hot) wire, smooth insulation on cord set to (1) socket terminal on fan control assembly.

2.Attach (1) pin terminal from black (neutral) wire, ribbed insulation on cord set to (1) socket terminal from white (neutral) wire on motor.

3.Attach (1) pin terminal on fan control assembly to (1) socket terminal from black (hot) wire on motor.

4.Attach green ground wire beneath one of the #10 x 1/2" (13mm) screws on the blower housing.

Fan Control

The automatic fan control is located in the switch box. The switch box is attached to the front of the blower assembly. The switch box is adjacent to the combustion chamber. The fan control is a non-adjustable automatic type. The fan control will require between 5 and 10 minutes of main burner operation before the fan control "closes" and activates the blower. The blower will continue to run between 5 and 10 minutes after the main burner shuts off, before the fan control "opens" and deactivates the blower.

Wiring

The appliance, when installed, must be electrically grounded in

accordance with local codes or, in the absence of local codes, with the National Electrical Code,ANSI/NFPA70 or Canadian Electrical Code, CSA C22.1, if an external electrical source is utilized. This appliance is equipped with a three-prong [grounding] plug for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug. For an ungrounded receptacle, an adapter, which has two prongs and a wire for grounding, can be purchased, plugged into the ungrounded receptacle and its wire connected to the receptacle mounting screws. With this wire completing the ground, the appliance cord plug can be plugged into the adapter and be electrically grounded.

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

WARNING:

Unplugging of blower accessory will not stop the heater from cycling. To shut heater off: Turn temperature dial or thermostat to lowest setting. Turn knob on gas control to "OFF", depressing slightly. Do not force.

Page 16

12434-9-0107

Image 16
Contents Installation Instructions Table of Contents Important Safety Information This is a Heating ApplianceSafety Informtaion for Users of LP-GAS Learn to recognize the odor of LP-gas. Your local LP-GasRequirements for Massachusetts Clear of ALL ObstructionsSpecifications IntroductionGAS Supply Recommended Gas Pipe DiameterInstallation Instructions Installing Wall Mounting BracketClearances Location of FurnaceInstalling Vent Assembly Reassembly And Resealing Vent-Air Intake SystemAttaching Furnace To Wall Mounting Bracket Cutting Vent TubesSystem Check Figure Thermostat LocationPiezo Pilot Ignitor Instructions For Your Safety Read Before Lighting Lighting InstructionsMain Burner Flame Characteristics Pilot Flame CharacteristicsPrimary Air Adjustment Figure Maintenance TroubleshootingHOW to Order Repair Parts Parts ListParts View Optional Blower Installation Instructions Optional Blower DRB-1Optional Blower Installation Instructions Service Notes Service Notes