Weil-McLain EG-30 THRU -75, PEG-30 THRU -65 manual Minimum clearances to combustibles, Installation

Page 13

Standing Pilot Boilers — Control Supplement

Damper installation continued

Minimum clearances to combustibles

Provide a minimum of 6” between the vent damper and any combustible material. (Provide a minimum of 46” between jacket top and combustible ceiling.) See EG • PEG • EGH Boiler manual for complete clearance requirements.

Installation

Do not modify draft hood or damper, or make another connection between draft hood and damper or boiler except as not- ed below. This will void CSA certification and will not be covered by Weil-McLain warranty. Any changes will cause severe personal injury, death, or substantial property damage.

1.Install vent damper horizontally or vertically as shown in vent damper manufacturer’s instructions. Vent damper must be installed so that it serves only one boiler and so damper blade indicator is visible to the user. See Figure 8.

2.Screws or rivets used to secure the vent damper to the draft hood must not interfere with rotation of the damper blade.

3.Install damper harness between damper actuator and knockout in jacket top panel. Use strain relief connectors and locknuts to secure both ends of the damper harness.

Keep wiring harness clear of all hot sur- faces.

4.Read and apply the harness plug warning label (shown above) so that it is visible after installa- tion.

5.Plug damper harness receptacle into damper harness plug.

Bypassing (jumpering) vent damper will cause flue products such as carbon mon- oxide to escape into the house. This will cause severe personal injury or death.

After boiler has operated once, if either end of the harness is disconnected, the system safety shutdown will occur. The boiler will not operate until harness is reconnected.

Effikal damper — Damper hold open switch must be in “Automatic Operation” position for system to operate properly.

Part Number 550-110-032/0607

13

Image 13
Contents Egpegegh Boiler manual EG-30 thru PEG-30 thruHazard definitions Please read this page firstTable of contents EG-30 thru 75 Series 4 and PEG-30 thru 65 Series EG-30 thru -65 water boilers without tankless heaters Control installationEG-75 water boilers without tankless heaters EG-30 thru 75 Series 4 and PEG-30 thru 65 Series EG-30 thru -65 water boilers with tankless heaters EG-30 thru 75 Series 4 and PEG-30 thru 65 Series EG-75 steam boilers with probe-type low water cutoff EG-30 thru 75 Series 4 and PEG-30 thru 65 Series EG-75 steam boilers with float-type low water cutoff Mount and wire controls per wiring diagram, 10, and FigureFollowing boiler models must have damper installed Damper installationFollowing boiler models may have damper installed Minimum clearances to combustibles InstallationRoom thermostat anticipator settings Checkout procedureLighting instructions Robertshaw EG-30 thru 75 Series 4 and PEG-30 thru 65 Series Standing Pilot Boilers Control Supplement Lighting instructions Robertshaw 7000ERHC Before troubleshooting TroubleshootingEvent of vent damper failure Checking thermocouple or thermopile open system Figure Troubleshooting Troubleshooting Troubleshooting Part number Replacement parts