Standing Pilot Boilers — Control Supplement
Control installation continued
For your safety, turn off electrical power supply and turn off external gas supply valve before attempting to work on the boiler. Failure to comply can cause severe personal injury, death or substantial property damage.
1. Mount and wire controls per wiring diagram, page Figure 4 8, and Figure 4.
a.Attach junction box inside left jacket panel with
b.Install transformer with
c.Operating and limit circuit wiring must be 18 gauge or heavier.
2.Bring supply wiring to boiler. Must be 14 gauge or heavier.
3.Proceed to page 12.
EG-75 steam boilers with probe-type low water cutoff
1. Mount and wire controls per wiring diagram, page Figure 5 8, and Figure 5.
a.Attach junction box inside left jacket panel with
b.Install transformer with
c.Operating and limit circuit wiring must be 18 gauge or heavier.
2.Bring supply wiring to boiler. Must be 14 gauge or heavier.
3.Proceed to page 12.