MAINTENANCE
Boiler maintenance includes periodic tank flushing and cleaning, and removal of lime scale from the heating elements. Circulating pumps should be oiled.
MAINTENANCE SCHEDULE
Component | Operation | Interval | Required | |
Tank | Flushing | Monthly |
| |
Sediment | As Needed |
| ||
| Removal |
| ||
|
|
| ||
Elements | Lime Scale | As Needed | UN•LIME® | |
Delimer and | ||||
Removal | ||||
|
| element gaskets | ||
|
|
| ||
Circulating Pump(s) | Oiling | Per pump makers instructions | ||
|
|
|
| |
Pressure Relief | Manually | Anually |
| |
Valve Test | Operate |
| ||
|
|
Pressure Relief Valve Test
The pressure relief valve must be manually operated at least once a year. Caution should be taken to ensure that (1) no one is in front of or around the outlet of the pressure relief valve discharge line, and
(2)the water manually discharged will not cause any bodily injury or property damage because the water may be extremely hot.
To test the relief valve, lift the lever at the end of the valve several times, see Figure 2. The valve should seat properly and operate freely.
FIGURE 2.
If after manually operating the valve, it fails to completely reset and continues to release water, turn off power to the boiler at the main disconnect switch or breaker. Close the cold water inlet to the boiler and follow the draining instructions in this manual to drain the boiler. Should the relief valve need to be replaced, call the toll free phone number listed on the back of this manual for further technical assistance.
Tank flushing and circulating pump lubrication should be performed in accordance with the above schedule. Tank sediment removal and element lime scale removal must be performed when needed as determined by period inspections. Following are the instructions for performing recommended maintenance.
System Cleaning
The hot water system should be internally cleaned and flushed to remove contaminants which may have accumulated during installation. System cleaning provides chemical stability necessary for component life and system performance.
Failure to clean the system may cause:
1.Poor heating due to formation of gas.
•Residential pipe dope, thread cutting oil, solder flux, dirt and other foreign materials breakdown to form gas. This is indicated by a continuing need for purging even through the system is “closed”.
2.Pump seal leakage.
•Acidic water (low pH) and contamination such as soil and sand result in premature or recurring pump seal failures.
3.Automatic air valve leakage.
•Contaminants cause sticky sealing surfaces and result in leakage.
4.Relief valve operation.
•Gas formation increases system pressure and relief valve spillage.
5.Water leaks at joints and fittings.
•Corrosion and eventual failure of connections occur when system pH is low.
6.Noisy operation.
•Heat transfer surfaces can be fouled with dirty, oily water. This plus gas lead to noisy water circulation.
FLUSHING
1.Turn off the electrical disconnect switch.
2.Open the boiler drain valve. Allow water to flow to an open drain until it runs clean. Do not come in contact with the water being drained as it may be very hot.
3.Close the drain valve when finished flushing.
4.Turn on the electrical disconnect switch.
SEDIMENT REMOVAL
Water borne impurities consist of fine particles of soil and sand which settle out and form a layer of sediment on the bottom of the tank. In time, if not removed, the level of sediment might reach the heating elements.
For convenience, sediment removal and element lime scale removal should be performed at the same time as follows:
WATER AND LIME SCALE REMOVAL
Water and lime scale accumulations on the heating elements is a normal condition, common to all immersion type elements. Factors which affect the amount of this formation are:
1.Amount of
2.Water temperature. As the temperature of the water is increased, more scale is deposited on the elements.
3.Characteristics of water supply. Regardless of water treatment, the elements should be examined regularly.
Water scale accumulations may cause noises to occur during operation.
It is recommended that a lower heating element be removed periodically for examination. If it is scaled, all of the elements should be removed and cleaned. If the tank bottom has an accumulation of sediment, it should be cleaned.