Chapter 3: TippingPoint X505 Overview
This chapter includes the following sections:
•“Install the TippingPoint Chassis” on page 20
•“Connect the power” on page 21
•“Complete Initial Setup Configuration” on page 21
•“Connect the X505 to the Internet” on page 22
•“Register the TippingPoint X505” on page 22
Install the TippingPoint Chassis
To install the TippingPoint you must do the following:
•Determine Total Rack Space
•Bolt the Device to the Rack
Determine Total Rack Space
Before you install the chassis, you should determine the total rack space that is required to install your system. The required rack space will increase if you plan to install multiple systems.
The X505 system fits in either a
Table 3 - 8: Rack Space Requirements
Requirement | Configuration Type | Min/Max Number of Chassis |
|
|
|
|
|
|
Physical Size of Rack | Typical | Maximum of 9 chassis on a |
(Total number of chassis must be |
|
|
< or = 42 RUs). Each TippingPoint |
|
|
|
| |
|
|
|
Network Equipment Building | Typical | 13 chassis generating < or = 105 Watts |
Systems (NEBS) |
|
|
(Total number of chassis must |
|
|
generate: < or = 1372 Watts) |
|
|
|
|
|
Bolt the Device to the Rack
Use the following guidelines when bolting the TippingPoint
WARNING: To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable.
20