ASSEMBLY INSTRUCTIONS:

INSTALLATION INSTRUCTIONS FOR MODEL ZCBB OPTIONAL WOODEN SURROUND (WS) (KIT# PAKDMZCBB)

CLEARANCES:

1.Sidewall Clearances: Clearances from the side of the firebox opening to any adjacent combustible wall should not be less than 7". See Figure 4

2.Ceiling Clearances: The ceiling height should not be less than 42" from the top of the firebox opening.

ASSEMBLY INSTRUCTIONS:

Tools Needed: Medium Phillips Screwdriver

Step 1: Lay out all components. (See diagram 1)

Step 2: Assemble end panels (A & B) to top front rail ( C ).

Step 3: Stand end panels and top front rail onto base (hearth) and fasten down with screws provided (See diagram 1).

NOTE: Position back of end panels with back of base (hearth) centering assembly from each end. In- stall front screws first, then pull back towards the inside to square the surround up. Install screws through back holes.

Step 4: Place top onto surround, flush with back and equal on each end. Secure both ends and middle with screws provided.

CONTINUED

11

Image 13
Contents Revised March UNIVERSAL BOXPage TABLE OF CONTENTS Page SAFETY INFORMATION WARNINGS TOP FRONT PANEL ZCBB FRONTCANOPY DOORSCHOOSING THE LOCATION FOR YOUR FIREBOX INSTALLATIONGAS LINE FIREBOX AND FRAMING DIMENSIONS ZC & FFFIREBOX CLEARANCES INSTALLING THE FIREBOXCLEARANCES FINISHING YOUR FIREBOXCOMBUSTIBLE CLEARANCES INSTALLATION INSTRUCTIONSTOP VIEW ZCBBCLEARANCES ASSEMBLY INSTRUCTIONSREAR VIEW DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION PRODUCING ADEQUATE VENTILATIONPage VENTILATION AIR FROM INSIDE BUILDING VENTILATION AIRVENTILATION AIR FROM OUTDOORS THERMOSTAT WIRES OPTIONAL BLOWER INSTALLATIONTHERMOSTAT BLACK WHITE WIRING DIAGRAM MA ZCBB714OPTIONAL PARTS REPLACEMENT PARTS