New Buck Corporation DV23ZC manual Horizontal Termination

Page 14

INSTALLATION

HORIZONTAL TERMINATION (continued)

NOTE:

‹The horizontal run of vent must be level, or have a 1/4-inch rise for every 1 foot of run toward the termination. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a fire.

‹A 2" clearance (airspace) MUST be maintained on all vent pipe.

4.With the pipe attached to the appliance adapter, slide the appliance into its correct location, and mark the wall for a 10" x 10" square hole. The center of the square hole should line up with the centerline of the horizontal pipe as shown in Figure 6. Cut and frame the 10" square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of non-combustible material, e.g., masonry block or concrete, a 9" diameter hole is acceptable.

5.Position the horizontal vent termination in the center of the 10" square hole, and attach to the exterior wall with the four wood screws provided. Before attaching the Vent Termination to the exterior wall, run a bead of non-hardening mastic around its outside edges, so as to make a seal between it and the wall. (See Figure 7.) The arrow on the vent cap should point up. (See Figure 6.) NOTE: Ensure that proper clearances to combustible materials are maintained.

Vent Opening

Combustible

Wall

10”

(254 mm)

10”

(254 mm)

Apply Mastic to All Four Sides

Vent Opening Noncombustible Wall

7 1/2”

Vent Cap

Wood Screws

(190mm)

 

Figure 6

12

Image 14
Contents Approved for Mobile Home Installation Page Table of Contents Page Introduction MIN. InputPage Assembly STEPS-OVERVIEW Location and ClearanceInstallation Interior Horizontal General Information Exterior Vent Locations and Restrictions MIN Vent Assembly Horizontal TerminationHorizontal Termination Connecting Vent Cap with Horizontal Vent Pipe Vertical Termination Vertical Termination Installation Natural GAS Propane LPG High AltitudeGAS Valve Connection GAS Pressure ChecksOperation Operating InstructionsControl Knob Page Page Glass Door Installation Pilot and FlamePage Accessories or Options Maintenance General MaintenanceKEY# Part Description Part Number Replacement PartsServicing Replacement Parts Additional Replacement Parts Part Description Part NumberProcedure WarrantyWarranty Conditions and ExclusionsOther Rights