New Buck Corporation DV23ZC manual Installation

Page 18

INSTALLATION

VERTICAL TERMINATION (continued)

NOTES:

‹Use only 45 degree elbows. Use of 90 degree elbows is not allowed in vertical terminations. The 45 degree elbows offer less restriction to the flow of flue gases and intake air.

‹For multi-story vertical installations, a Ceiling Firestop, (Simpson-Dura-Vent, Part 963) is required at the second floor, and any subsequent floors (Figure 14). The opening should be framed to 10" x 10" inside dimensions, in the same manner as shown in Figure 11.

Figure 14

‹Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passes through, must be enclosed. The enclosure may be framed and sheet rocked with standard construction materials. However, consult the vent manufacturer’s installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air spaces with insulation.

16

Image 18
Contents Approved for Mobile Home Installation Page Table of Contents Page Introduction MIN. InputPage Assembly STEPS-OVERVIEW Location and ClearanceInstallation Interior Horizontal General Information Exterior Vent Locations and Restrictions MIN Vent Assembly Horizontal TerminationHorizontal Termination Connecting Vent Cap with Horizontal Vent Pipe Vertical Termination Vertical Termination Installation Natural GAS Propane LPG High AltitudeGAS Valve Connection GAS Pressure ChecksOperation Operating InstructionsControl Knob Page Page Glass Door Installation Pilot and FlamePage Accessories or Options Maintenance General MaintenanceReplacement Parts ServicingKEY# Part Description Part Number Replacement Parts Additional Replacement Parts Part Description Part NumberProcedure WarrantyWarranty Conditions and ExclusionsOther Rights