Heat & Glo LifeStyle 6000GLX-IPILP-S/-R, 6000GLX-IPI-S/-R Install Attic Insulation Shield

Page 35

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in

 

area to be insulated.

Match the three holes in each side and fasten with three

 

screws to form a tube.

Bend three tabs on the bottom of the shield outward to

 

allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain

 

the air space between the pipe and the shield. Set the

 

shield on the ceiling firestop and attach to the firestop.

BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE

INSERT 3

SCREWS

Figure 8.5 Attic Insulation Shield

BEND 3 TABS

OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE

• Bend all tabs inward 90º around the top of the shield.

These tabs must be used to prevent blown insulation

from getting between the shield and vent pipe, and to

maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

E. Installing the Optional Heat-Zone-Gas Kit

Remove the knockout from the fireplace and discard it (see Figure 8.6).

Center the duct collar around the exposed hole and attach it to the fireplace with 3 screws. Note: Do this BEFORE final positioning of fireplace.

Determine the location for the air register/fan housing assembly.

Reference the Heat-Zone-Gas kit instructions for the remaining installation steps.

HEAT-ZONE-GAS

ATTACHES HERE

Figure 8.6 Heat Zone Cover Plate

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. Q • 11/08

35

Image 35
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyV1 Minimum H1 + H2 Maximum Vent Diagrams Top Vent Horizontal TerminationV1 Minimum H1 Maximum Min Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationTwo Elbows H1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-Gas Kit Flat Ceiling InstallationProceed to . C Appliance PreparationChoosing the Top or Rear Vent Rear Vent Securing and Leveling the Appliance Installing the Non-combustible BoardAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Gas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Placement of Embers Ember PlacementInstall the Log Assembly Log Assembly LOGS-6000GLX LOGS-6000GLXLP11 Front View 17 Front View Air Shutter Settings Install the MeshInstall Trim and/or Surround Air Shutter SettingIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination Cap13-3/4 13-7/8 352 mm 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 302 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 251 mm 165 mm165 mm 222 mm 235 mm 152 mm 168 mm ElbowTermination Cap Snorkel Support Box-BlackBlack Cathedral Ceiling VerticalService Parts Log Set AssemblyAt Depot Service Parts ListStocked 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information