Heat & Glo LifeStyle 6000GLX-IPILP-S/-R Top Vent Horizontal Termination Three Elbows, Min Max

Page 25

Top Vent - Horizontal Termination - (continued)

Three Elbows

V1 Min.

H1 Max.

 

V2 Min.

H2 Max.

 

 

 

 

 

 

 

 

 

Elbow only

2 ft.

610 mm

0 in.

 

0 mm

1 ft.

305 mm

6 in.

152 mm

3 ft

914 mm

6 in.

 

152 mm

2 ft.

610 mm

1 ft.

305 mm

6 ft.

1.8 m

1 ft.

 

305 mm

6 ft.

1.8 m

 

 

 

 

 

 

 

 

 

2 ft.

610 mm

11 ft.*

3.4 m*

2 ft.

 

610 mm

10 ft.*

3.1 m*

 

 

 

 

 

 

 

 

 

3 ft.

914 mm

16 ft *

4.9 m*

3 ft.

 

914 mm

14 ft.*

4.3 m*

 

 

 

 

 

 

 

 

*H1 + H2 = 20 ft. (6.1 m) Maximum

V1 + V2 + H1 + H2 = 40 ft. (12.2 m) Maximum

 

 

 

 

 

 

 

 

 

H2

V2

H1V1

Figure 7.5

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. Q • 11/08

25

Image 25
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceOn position. The ON/OFF switch may Turn off all electric power to the applianceLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsIPI Pilot Flame Patterns Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationV1 Minimum H1 + H2 Maximum Min Max Top Vent Horizontal Termination Three ElbowsBreak Here Two Elbows Top Vent Vertical TerminationMaximum + V 2 Min H1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage H1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-Gas Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationChoosing the Top or Rear Vent Appliance PreparationProceed to . C Rear Vent Securing and Leveling the Appliance Installing the Non-combustible BoardAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Ansi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination Cap DVP and SLP PipeRefer to of this manual Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Placement of Embers Ember PlacementInstall the Log Assembly Log Assembly LOGS-6000GLX LOGS-6000GLXLP11 Front View 17 Front View Install Trim and/or Surround Install the MeshAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination CapRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 165 mm 222 mm 235 mm 152 mm 168 mm 165 mmElbow 251 mmBlack Snorkel Support Box-BlackCathedral Ceiling Vertical Termination CapService Parts Log Set AssemblyStocked Service Parts ListAt Depot 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information