PVCT COLINEAR TRANSITION VENT KIT
Available from Empire Comfort Systems, Inc.
Colinear Transition Plate
Note: Exhaust must be a minimum of 3” above air intake inlet.
OPTIONAL EXHAUST CAP
MODEL PVVTC
ORDER SEPARATE
AIR INTAKE
PTRAP OR 2 90° ELBOWS
SUPPLIED BY INSTALLER
PVC CEMENT
3” MIN.
PVC CEMENT
HEIGHT (MIN. 12”)
TRANSITION PLATE
OUTDOOR SEALER REQUIRED
EXHAUST
PTRAP OR 2 90° ELBOWS
SUPPLIED BY INSTALLER
AIR INTAKE
PTRAP OR 2 90° ELBOWS
SUPPLIED BY INSTALLER
PVC CEMENT
3” MIN.
PVC CEMENT
HEIGHT (MIN. 12”)
TRANSITION PLATE
OUTDOOR SEALER REQUIRED
Flat Roof or Chimney Application
1.Attach plate to chimney chase or flat roof with four (4) screws. Use outdoor sealant to seal transition plate to the roof or chimney chase.
2.Check local codes to determine air intake height from roof. The minimum height for this application is 12”.
3.Cut 1 1/2” PVC pipe to correct height. Attach pipe, PTrap, and exhaust cap to plate. Glue all joints with PVC cement.
Note: Must maintain a minimum 3” between exhaust outlet and air intake.
Horizontal Application
1.Attach plate to outside wall with four (4) screws. Use outdoor sealant to seal transition plate to the wall.
2.Cut 1 1/2” PVC pipe to correct length. The minimum length for this application is 9” for the exhaust and 6” for the air intake. Glue all joints with PVC cement.
Page 29 |