Elitegroup PV-28SV55-(CN,CP,GN,GP)-1 Clearances for Direct Vent, Installation on Rugs and Tile

Page 9

CLEARANCES FOR DIRECT VENT

1.Pick a location on a wall with a clear space in the room. In selecting a location for installation, it is necessary to provide adequate accessibility clearances for servicing and proper installation. Be sure to locate the unit close enough to a 110 VAC wall receptacle to properly power appliance.

2.When facing the front of the furnace the minimum clearances from casing to combustible construction are 0” (0mm) on top, 0” (0mm) on each side, recommend 4” (102mm) on sides for servicing and 0”(0mm) from the floor, 0” (0mm) to rear wall and 40” (1016mm) from Mantis top to ceiling.

3.The minimum distance from the center of the vent cap to the nearest outside corner or obstruction is 12” (305mm).

4.The minimum wall depth is 4” (102mm) and the maximum is 48” (121.92cm).

The vent terminal of a direct vent appliance, with an input of 50,000 BTU (14.6KW) per hour or less shall be located at least 9” (229mm) from any opening through which flue gases could enter a building.

The bottom of the exhaust vent terminal and the air intake shall be located at least 12” (305mm) above grade and must be vented outside.

WARNING: The nearest point of the vent cap should be a minimum horizontal distant of six (6) feet (1.83m) from any pressure regulator. In case of regulator malfunction, the six (6) feet (1.83m) distance will reduce the chance of gas entering the vent cap.

Installation on Rugs and Tile

If this appliance is to be installed directly on carpeting, tile, or other combustible material, other than wood flooring, the appliance shall be installed on a metal or wood panel extending the full width and depth of the appliance.

The base referred to above does not mean the fire-proof base as used on wood stoves. The protection is primarily for rugs that may be extremely thick and light-color tile that can discolor.

HEATER INSTALLATION FOR DIRECT VENT

Locating Wall Opening

The recommended location for this furnace is on an outside wall. Locate wall studs so that wall vent opening will be located between wall studs. The wall opening required for venting is a 3 1/2” (89mm) minimum diameter opening.

Refer to Figures 3 and 6 for positioning the heater on wall and for locating gas line connection and vent opening. Furnace can sit on the floor.

1 9/16”

4 3/32”

Figure 2

22618-12-0707

Page 9

Image 9
Contents Installation Instructions Table of Contents This is a Heating Appliance Important Safety InformationLP-GAS Warning Odor Safety Information for Users of LP-GASVent Directly BELOW. Keep Clear of ALL Obstructions Requirements for MassachusettsPressure Testing of the Gas Supply System Installing a New Main Gas CockGAS Supply Recommended Gas Pipe DiameterIntroduction Installation Instructions General Safety Information SpecificationsInstallation on Rugs and Tile Heater Installation for Direct VentClearances for Direct Vent Locating Wall OpeningClearances for Single Flue Heater Installation for Single FlueHeater with Pedestal and Single Flue Adaptor Heater without pedestal SpecificationsFireplace Insert with Mantel Surround with Slim Top Panel Fireplace Insert with Mantel Surround with Short Top Panel Freestanding Units Clearance to CombustiblesInsert Into Masonry Fireplace Rough Framing DimensionsWall Clearances Log Installation All Logs LOG SET Installation InstructionsVent Examples for Single Flue Venting for Existing Fireplace Installation Single Flue Venting with Shroud InstalledSingle Flue Vertical Vent Run Shroud Kit Model# Pvsh Determining Minimum Vent Height Above RoofSingle Flue Vertical Vent Run With 45 degree elbows Available from Empire Comfort Systems, Inc PVVK-CFA Flex Vent KITPVVK-SH Horizontal Vent Adaptor KIT Horizontal Examples for Colinear Direct Vent Vertical Examples for Colinear Direct Vent Colinear Direct Vent Pitched Roof Installation Colinear adaptor Pvca Horizontal Colinear Direct Vent AdaptorTermination Cap Pvvtc Termination CAP Vent KITPvct Colinear Transition Vent KIT Flat Roof or Chimney ApplicationHorizontal Application Direct Vent System Building Exterior View Direct Vent Installation InstructionsHorizontal Venting Maximum Horizontal Venting 47 1/2 1.2mMinimum Exterior Grade Dimension Unit With Pedestal Minimum Exterior Grade Dimension Unit Without PedestalStep PVVK-24H and PVVK-48H Vent KITPVVK-24H and PVVK-48H Vent KIT GAS Connection Line Supply GAS Connection Installation InstructionsOperating Instructions Checklist Lighting Instructions For Your Safety Read Before Lighting FAN Operation Conversion Instructions from LP Propane GAS to Natural GAS GAS Conversion InstructionsConversion Instructions from Natural GAS to LP Propane GAS Automatic Humidifier Operation Optional Controllers Installation Instruction for TMV2 Two Stage Thermostat ModelEconomy Display Mode Wiring Diagram WiringOver Temperature Cut Out MaintenanceGeneral Information Paint Curing First FiringGlass Assembly Replacement Front door removal drawing Glass CleaningMain Burner Drawing Cleaning Main Burner General Glass InformationUnit Operating Faults Resetting the HeaterLOG Placement Surround Installation Instructions Main Convection FANHeat Exchanger Optional Pedestal Assembly Installation Pedestal Installation InstructionsIndex Part Number Description Parts ListGAS Line Front Parts View 7368 Purchase Date Dealer Name/Phone Warranty TermsService Notes HOW to Order Repair PartsService Notes