Desa FBPS Operating Guidelines & Maintenance Instructions, Heat Deflective Hood Installation

Page 13

OWNER’S MANUAL

INSTALLATION

Continued

HEAT DEFLECTIVE HOOD INSTALLATION

The factory supplied heat deflective hoods must be installed inside the fireplace open- ings on all three sides for the safe operation of the unit as shown in Figure 19.

1.Remove protective covering from hoods.

2.Position deflective hood into opening on one side of the firebox and secure to the top of the opening using screws provided.

3.Secure the ends of the hood to the fire- box using two screws (provided) for each side.

4.Repeat steps 2 and 3 to install hoods on the remaining side and end of firebox.

CAUTION: Do not clean hood with abrasive cleanser. Use only regular household cleaners and a smooth cloth.

Front Hood

(Typical Each Side)

OPERATING GUIDELINES & MAINTENANCE INSTRUCTIONS

When lit for the first time, a vent-free log heater will emit a slight odor for about an hour or two. This is a normal occurrence which is due to the "curing" of the logs and the "burn-in" of internal paints and lubri- cants used in the manufacturing process.

Keep control compartments, logs, burners, and areas surrounding the logs clean by vacu- uming or brushing at least twice a year. Temporary removal of the log set may ease the cleaning of the burner and pilot assembly. In cleaning, take care not to alter the settings on the pilot assembly. See the operating instructions supplied with your vent-free log heater for additional cleaning instructions.

WARNING: Logs can be very hot! Allow logs to cool before handling.

IMPORTANT: Turn off the gas supply at the external shutoff valve before servicing appliance. Any safety screen or guard re- moved for servicing must be replaced prior

WARNING: Children and adults should be alerted to the hazards of high surface tempera- tures and to stay away to avoid burns or clothing ignition. Young children should be carefully su- pervised when they are in the same room as the appliance.

For lighting and operating this vent-free firebox, please refer to the vent-free gas logs manufacturer’s instruction manual.

Corner Post

2 Screws

Each End of

Hood

3 Screws (Top)

to operating the appliance.

Installation and repair should be done by a qualified person. The appliance should be inspected before use and at least annually by a professional service person. More fre- quent cleaning may be required due to ex- cessive lint from carpeting, pet hair, etc. It is imperative that the control compartments, burners and circulating air passageways of the appliance be kept clean.

Figure 19- Typical Hood Installation (Both Sides)

105163

13

 

Image 13
Contents What to do if YOU Smell GAS Unvented VENT-FREELocal Codes Safety InformationUnpacking Product Specifications Product FeaturesBlower Accessory OperationAIR for Combustion and Ventilation Locating FireboxProviding Adequate Ventilation Determining FRESH-AIR Flow for Firebox Location AIR for Combustion VentilationDetermining if You Have a Confined or Unconfined Space Ventilation Air From Inside Ventilation AIRBuilding Ventilation Air From OutdoorsInstallation Clearances InstallationScreen Mantel Clearances for Projected Built-In InstallationFraming for Built-In Firebox Installation Top View Firebrick Floor Remove Knockout Thick Liner Installing GAS LineHARD-WIRING Firebox GAS Supply TestingElectrical Installation Operating Optional Blower GA3500A Optional Blower Assembly InstallationHeat Deflective Hood Installation Operating Guidelines & Maintenance InstructionsTechnical Service Replacement PartsParts Under Warranty Parts not Under WarrantyPolished Brass Hood AccessoriesFirebox TOP Blower GA3500ABreakdown IllustratedKEY Part Number Fbps Description QTY Parts ListWarranty Information

FBPS specifications

Desa FBPS, or Flexible Building Production System, is an innovative approach to construction that leverages advanced technologies to enhance efficiency, sustainability, and adaptability in building design and construction. This system is gaining traction in the industry due to its versatility and ability to integrate new methodologies suitable for various construction environments.

One of the main features of Desa FBPS is its modular design. This allows for the construction of buildings using pre-fabricated components, which can be assembled on-site with minimal disruption. This modularity not only speeds up the construction process but also reduces waste, as components are manufactured in a controlled environment where precision and quality can be more easily maintained.

Another significant characteristic of Desa FBPS is its use of smart technologies. The system incorporates IoT (Internet of Things) devices, enabling real-time monitoring of building conditions, energy consumption, and other critical parameters. This data-driven approach facilitates timely decision-making and maintenance, improving the overall longevity and functionality of the buildings.

Sustainability is a core principle of Desa FBPS. The system prioritizes eco-friendly materials and energy-efficient designs, often utilizing renewable energy sources and advanced insulation technologies. This focus on sustainability not only lowers the carbon footprint of construction but also results in long-term savings on energy costs for occupants.

Desa FBPS also emphasizes flexibility in design. Buildings constructed using this system can be easily expanded or modified to adapt to changing needs. This flexibility is particularly advantageous in urban areas where space is at a premium and evolving residential or commercial demands necessitate rapid responses from developers.

Additionally, the integration of Building Information Modeling (BIM) technology plays a crucial role in Desa FBPS. BIM allows for the visualization of a building throughout its lifecycle, facilitating better planning, collaboration among stakeholders, and improved project management.

In summary, Desa FBPS represents a paradigm shift in construction practices, characterized by modular design, smart technology integration, sustainability, and design flexibility. Its forward-thinking approach positions it as a leader in modern construction, addressing the growing demands for efficient and adaptable building solutions in a rapidly evolving world.