Desa V36EN-A, VV36ENB, V36EP-A, VV36EPB installation manual Vertical Termination Configurations

Page 14

14

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination (Cont.)

VENTING INSTALLATION INSTRUCTIONS

Continued

Vertical Termination Configurations

Figures 21 through 24 show four different configurations for verti- cal termination.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

 

Note: Install

45° Elbow

restrictor into inner

collar of fireplace

 

as shown.

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

Note: Install restrictor

 

into inner collar of

 

fireplace as shown.

Figure 21 - Vertical Venting Configuration Using Two 90° Elbows with Two Horizontal Runs (Vertical Round High Wind Termination Shown)

Figure 22 - Vertical Venting Configuration Using One 90° Elbow (Vertical Round High Wind Termination Shown)

Venting with Two 90° Elbows

Vertical (V1)

Horizontal (H)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

Note: Install restrictor into inner collar of fireplace as shown.

45° Elbow

Note: Vertical (V1) + Vertical (V2) = 40' max.

Figure 23 - Vertical Venting Configuration Using Two 90° Elbows

(Vertical Round High Wind Termination Shown)

For..com

111253-01D

Image 14
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Table of Contents Safety InformationProduct Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Exterior Horizontal Termination Configurations Ground Floor InstallationCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Desa 5/8 Pipe & Vent Kits High Altitude InstallationParts Lists for Venting Kits and Components Model BK Installation Fireplace InstallationInstalling Optional Blower Accessory Check GAS TypeModel BKT Installation Attaching Speed Control to FireboxInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Connecting Fireplace to GAS Supply Gas ConnectionChecking GAS Connections Pressure Testing Gas Supply Piping SystemPressure Testing Fireplace Gas Connections Removing Louver Panels Cleaning Glass DoorREMOVING/REPLACING Glass Door Removing Glass DoorInstalling LOGS, Lava Rock and Glowing Embers Installing Rear Brick PanelInstalling Log No Installing Log No Optional Remote Control Wiring DiagramWall Switch Installation Lighting Instructions For Your Safety Read Before LightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating Optional Blower AccessoryPilot Assembly Burner Flame PatternPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyGas leak. See Warning statement at Illustrated Parts Breakdown ModelsParts List VV36EPSB1 VV36EPHB1 Description QTYBurner Assembly for Models KEY Part Number Description QTY Specifications Replacement Parts Service HintsTechnical Service Parts Under WarrantyOwners Registration Form Postage Required Accessories Warranty Information